Level-Rite
TM
BY RITE
-
HITE
®
LRL Series Elevating Dock Lift Owner’s Manual
Pub. No. 1174-R1 - June 2004
11
INSTALLATION INSTRUCTIONS - CONT.
5. Using mounting brackets on the frame as a guide,
drill hole of 5/8” diameter a minimum of 4-5/8” deep.
Clean out hole. See figure 5.
6.
Insert 5/8” x 5” wedge anchor bolts. See figure 5.
7.
Remember to check that the lift clears all possible
obstructions and does not create dangerous pinch or
shear points by operating it up and down a few
times.
8.
Raise and lower elevating dock lift at least three
times to expel air from the system.
9.
Observe carefully for any oil leaks.
INSTALLATION COMPLETE!
FRAME
LAG FRAME TO FLOOR
USING 5/8" x 5"LG.
WEDGE ANCHOR BOLTS
ALTERNATE
LAG BRACKET
POSITION ON
FRAME ENDS
TOP VIEW
PLATFORM REMOVED
FIGURE 5 - ANCHOR INSTALLATION
Never be under the LRL platform or lip without:
• Engaging the Maintenance Strut.
• Turning off power to the control box.
• Locking out and tagging out the main
power source, as shown under Safety
Warnings.
DANGER