东方日升新能源股份有限公司
PV module installation and
maintenance manual
RISEN ENERGY CO.,LTD.
主导部门:组件研发中心
Page:NO.24 ,Total 41
表
8-3 Photovoltaic module connector accessories
Procedure
Method
Explanatory Chart
①
After unplugging the photovoltaic
connector, take either end and
cover the cold shrinkable tube to
the connector in the direction
shown on the right
②
Slide the cold shrinkable tube over
the head of the connecting head
and expose the head
③
Connect the positive and negative
connectors in the correct way
④
Move the connection to the middle
of the cold shrinkable tube
⑤
Pull the inner ring exposed in the
cold shrinkable tube by hand,
rotate and pull it out again and
again until the inner ring is
completely pulled out
⑥
The cold shrinkable tube has
completely cold shrinkable seal
connectors
Notes for installation of cold shrinkable pipe
:
①
Before installation, make sure that there is no sand, water, sharp objects and
other sundries inside the cold shrinkable tube.
;
②
It is forbidden to tie the label on the shrink tube to prevent the tie from
scratching the shrink
;
③
Pay attention to environmental protection on site (handling of support
strips/instructions/packaging bags)
;
④
There are no cracks or gaps at both ends of the cold shrinkable tube and no
cracks on the surface
;
⑤
The cold shrinkable tube should be affixed to the connector and cable in a
natural way, and no wrinkle or bulge is allowed
;