HEATER INSTALLATION
9. INSTALLATION AND COMMISSIONING CHECKLIST
•
Complete the Installation Check List and the Installer details below.
•
Instruct customer on the Rinnai RHFE-952ER / RHFE-1252ER Power Flued Flamefire operation.
•
Ensure the customer understands the content of this manual.
10. FINAL CHECKLIST
Advise the customer that during the initial burning period of approximately 2 hours, some smoke
and odour may be experienced. During this period the heater should be operated on ‘High’ and
the space being heated should be well ventilated. It may take up to 20 minutes of operation for
the logs to achieve their full flame pattern and glow.
The glass dress guard fitted to this appliance reduces the risk of fire and injury and no part of it
should be permanently removed.
•
For protection of young children or the infirm a secondary guard is required.
•
Ensure this Operation and Installation manual is left with the customer.
Ensure the Customer understands that:
No part of this appliance should be permanently removed.
Paper or other material MUST NOT be burnt in this appliance.
Young children and the infirm should be supervised at all times.
(To be completed by certified Gas Installer)
NO
/
YES
1. Appliance positioned in a suitable location?
(clearances, combustible clearances, mantels & surrounds, etc.).
2. Is a Rinnai approved flue system installed & tested in accordance with the instructions?
3. Gas pressure checked and set?
4. Has the burner media been installed as per instructions?
5. Appliance tested for correct operation and to ensure no gas leaks?
6. Customer instructed on operating procedure and safety requirements?
7. Is the end-user fully aware of operating procedure?