Rinnai
21
RHFE 952_1252 OIM
FLUE INSTALLATION
TYPES OF FLUE INSTALLATIONS
FLUE SYSTEM TRANSITION CASTING
Consult the Rinnai “Power Flued Flamefire Space Heater Co-axial Flue System Installation Manual”
supplied with flue kits ASPDFK or ASPKIT03 for detailed flue installation instructions. Use only
Rinnai Flue components with this appliance.
Option
Components
Order Codes
Direct
‘Direct Flue’ Kit
ASPDFK
Vertical
Extension
‘On Wall’ Kit
Co-axial Pipe 900mm*
Roof Cowl
ASPKIT03
ESPIPE900
ESROOFCOWL
Vertical
Extension
‘On Wall’ Kit
Co-axial Pipe 900mm*
Bends (2 x 45°)
Roof Cowl
ASPKIT03
ESPIPE900
ESBEND
ESROOFCOWL
Vertical
Extension
‘Direct Flue’ Kit
Co-axial Pipe 900mm*
Bends (2 x 45°)
Condensate Trap Kit
Roof Cowl
ASPDFK
ESPIPE900
ESBEND
ESCONDK
ESROOFCOWL
Vertical
Extension
‘Direct Flue’ Kit
Co-axial Pipe 900mm*
Bends (2 x 45°) Condensate
Trap Kit
Wall Terminal Kit
ASPDFK
ESPIPE900
ESBEND
ESCONDK
ESWTKIT
Sideways
Extension
‘On Wall’ Kit
Co-axial Pipe 900mm *
Wall Terminal Kit
ASPKIT03
ESPIPE900
ESWTKIT
Down & Out
Extension
‘On Wall’ Kit
Co-axial Pipe 900mm*
Bends (2 x 45°)
Wall Terminal Kit
ASPKIT03
ESPIPE900
ESBEND
ESWTKIT
* Order number of lengths as required
Flue is NOT to be terminated under the floor or in a roof space.
‘Down & Out’ and vertical ‘through roof’ flue installations are permitted ONLY when the flue
terminal is located externally.
For horizontal installations there must be a continuous fall of at least 2° to the termination point to
drain condensate.
All terminations exceeding a vertical height of 1.5 metres must incorporate a condensate trap.
‘Down & Out’ flue systems must have a continuous fall of at least 2° to the termination point to
drain condensate. Flue terminal must be at least 300 mm above the ground in accordance with
AS/NZS 5601 - Fig. 6.2.
The flue system transition assembly provides a connection between the flue system and the heater’s flue spigot
and air intake hose.
A minimum 5 mm clearance from combustible
materials to the transition casting is required.
This clearance is provided automatically when
the 'stand off' brackets
that are supplied are
used.
Flue system transition casting components
are:
transition casting flue outlet,
transition casting air inlet and
Wall plate.
IMPORTANT
I
II
III
IV
V
DO NOT
DO NOT
I
II
A
II
B
III
A
III
B
IV
V
DO NOT
IMPORTANT
1
2
1
2
2
4
1
1
1
4
4
2
4
3
2
I III
IV
II
V
Options
Option
Option
Option
4
1
2