PRE INSTALLATION SURVEY
Carefully survey the area to be heated. It is recommended that a full heating design including
heat loss calculation be conducted on the structure or area to be heated. Heater sizing, quanti-
ty, and placement must consider available mounting height, sources of greatest heat loss.
The certified clearances to combustibles must always be maintained with respect to stored ma-
terial, moveable objects (vehicles, lifts, overhead doors, etc), sprinkler system heads, furniture
and draperies, and other obstructions at the site. Consideration must also be given to vent
placement and the allowable length of vent .
(see section 11, page 19)
Installation must conform with all local, state, provincial and national code requirements includ-
ing the current latest edition ANSI Z223.1 (NFPA 54) in the U.S.A. for gas burning appliances
and equipment. The latest edition Electrical Code ANSI/NFPA N0 70 in the U.S.A. must also
be observed.
The heating system must have gas piping of the correct diameter, length, and arrangement to
provide adequate fuel supply and function properly. A dimensioned layout drawing is advised.
7. MOUNTING CLEARANCES
This heater must be mounted with at least the minimum clearances between the heater and
combustibles as shown in FIG
-
1, TABLE 1, Pages 8 & 9.
It is the installer
’
s responsibility to
ensure that building materials with a low heat tolerance which may degrade at lower
temperatures are protected to prevent degradation. Examples of low heat tolerance ma-
terials include vinyl siding, fabrics, some plastics, filmy materials, some coatings and
laminated finishes, etc
.
Ensure adequate clearance around the air intake at the burner to allow sufficient com-
bustion air supply to the heater.
Proximity of lights, sprinkler heads, overhead doors, storage areas, gas and electrical lines,
parked vehicles, cranes and any other possible obstruction or hazard must be evaluated.
Place the heater so as not to cause a hazard to a wall, floor, shelving, curtains, furniture, or
door when open, or impede the free movement of people.
It is recommended that Protective Guard JS
-
0502
-
UR
-
GK be installed on any heater mounted
with less than 8 feet from floor to bottom of heater (See Accessories
-
Page 47).
FIGURE 3
6”
(
15
cm
)
24”
(61 cm)
8. SERVICE CLEARANCE
: The lower
‘
jaw
’
of the burner cabinet swings down to provide con-
venient service access to burner components. Provide a minimum clearance from any wall or
obstruction of 6 inches (15 cm) to the access end of the burner housing, and a minimum of 24
inches (61 cm) to any ONE side to allow burner service. (see Figure 2 below)
The minimum clearances to combustibles must always be maintained.
Summary of Contents for RHE1S40N
Page 1: ......
Page 4: ...4 HE Series Infrared Gas Heater Installation and Operation Manual...
Page 53: ...53 HE Series Infrared Gas Heater Installation and Operation Manual NOTES...
Page 54: ...54 HE Series Infrared Gas Heater Installation and Operation Manual NOTES...
Page 55: ...55 HE Series Infrared Gas Heater Installation and Operation Manual NOTES...
Page 56: ......