
10
HE Series Infrared Gas Heater Installation and Operation Manual
For your convenience a
“
peel and stick
”
sign is provided
with this heater. This sign must be posted
either adjacent
to the IR heating system thermostat or in the absence of such thermostat, in a conspicuous
place specifying the
required clearances from the heater to the combustibles.
Use a permanent marker to record the required clearance dimensions on the sign.
‘
H
’
is a value calculated at site: (
H
=
T
-
C
)
Refer to Figure 1 and Table 1 above
•
Measure the on site distance between bottom of the heater and the floor =
‘
T
’
inches (cm).
•
The minimum clearance to combustibles below this heater
‘
C
’
is
53 inches (1346 cm)
•
Subtract
‘
C
’ 53
inches (1346 mm) from
‘
T
’
(Height above floor) to get value
‘
H
’.
•
Enter the calculated value
‘
H
’
on the sign
Enter the values as required for the other dimen-
sions:
‘
S
’ = 24” (610
mm)
‘
F
’= 48” (1120
mm)
‘
B
’ = 12” (305
mm) at 30°
Or
‘
B
’ = 24”
if mount angle less than 30°
POST THIS SIGN ADJACENT TO THE HEATER
THERMOSTAT OR IN A PROMINENT LOCATION
.
24”
12”
48”
WARNING
VENT CLEARANCE
: Clearance from single wall
’
C
’
vent pipe inside the building is deter-
mined by local or national installation codes, but must not be less than 6 inches (150 mm).
Clearance from the vent terminal outside the structure are indicated in Section 11 Flue Vent-
ing and Figures 9 to 12, pages 19 to 23 for details and requirements for venting.
Summary of Contents for RHE1S40N
Page 1: ......
Page 4: ...4 HE Series Infrared Gas Heater Installation and Operation Manual...
Page 53: ...53 HE Series Infrared Gas Heater Installation and Operation Manual NOTES...
Page 54: ...54 HE Series Infrared Gas Heater Installation and Operation Manual NOTES...
Page 55: ...55 HE Series Infrared Gas Heater Installation and Operation Manual NOTES...
Page 56: ......