background image

Rinnai New Zealand Limited

Electronic Super Ray Operation and Installation: 

10081-B 02-11

5

Definition of an Outdoor Area

This appliance shall only be used in an above ground open air situation with natural ventilation,  

without stagnant areas and where gas leakage and products of combustion are rapidly 

dispersed by wind and natural convection.

Any enclosure in which the appliance is used shall comply with one of the following:

•  With walls on all sides, but at least one permanent opening at ground level and no 

overhead cover 

open both 

ends

a)

b)

•  With a partial enclosure that includes an overhead cover and no more than 2 walls 

•  Within a partial enclosure that includes an overhead cover and more than 2 walls, the 

following shall apply: 

 

a)  at least 25% of the total wall area is completely open 

b)  at least 30% of the remaining wall area is open and unrestricted 

•  In the case of balconies, at least 20% of the total wall area shall be and remain open and 

unrestricted

Summary of Contents for ODHRAD3EN

Page 1: ... and indoors subject to room size Not recommended for locations directly near the sea or areas continually subjected to strong winds Appliance must be installed commissioned and serviced by a licensed tradesperson in accordance with these instructions and all applicable local rules and regulations Installer please leave this manual with the customer ...

Page 2: ...apply if for example the product has been improperly installed or is otherwise installed contrary to manufacturer s recommendations has been damaged during or after installation has not been operated in accordance with operating instructions or has been subjected to damage or abuse beyond that expected from conditions of normal use 3 Warranty claims may be invalid if not accompanied by details of ...

Page 3: ...rmation contact Rinnai on 0800 RINNAI 0800 746 624 Customer Information Limited Warranty 2 Features 4 Appliance Location Important 4 Definition of an Outdoor Area 5 General Information 6 Control Panel Operation 7 Remote Control 8 Installation Information Before Installation 9 Specification Information 9 Procedure 10 Wiring Diagram 11 Installer Details 11 Customer Contacts 12 ...

Page 4: ...are some stringent criteria governing where it can be located In addition to the clearances stated below you must also ensure the following For commercial indoor use this appliance must not be used in a room smaller than 125 m3 and ventilation requirements must comply with NZS 5261 2 6 6 Outdoor locations comply with Definition of an Outdoor Area on following page Outdoor use only for domestic app...

Page 5: ...ce is used shall comply with one of the following With walls on all sides but at least one permanent opening at ground level and no overhead cover open both ends a b With a partial enclosure that includes an overhead cover and no more than 2 walls Within a partial enclosure that includes an overhead cover and more than 2 walls the following shall apply a at least 25 of the total wall area is compl...

Page 6: ...ption 1 for a service centre in your area For reliable operation Rinnai Super Rays should be serviced every 2 years If they are in a harsh outdoor environment or intensively used for example in a commercial application annual servicing would be beneficial Regular servicing is not covered by the Rinnai warranty If you have any faults or problems please refer to your installer or contact Rinnai Poss...

Page 7: ...ps Standby To turn to pilot only press STANDBY until the unit beeps This function is not used in the day to day operation of the appliance Power supply and battery replacement The heater has a dual power supply option and can operate via a 9 V 2 1 mm DC power socket or 6 x AA batteries Important When using the 9 V power socket ensure that the empty battery housing remains connected so that contact...

Page 8: ...t beeps When turning the unit on it will start the electronic spark The pilot will ignite first followed by the plaques approximately 10 seconds The heater will start on the high setting Low and high setting Press either LOW or HIGH until the unit beeps Standby To turn to pilot only press STAND BY until the unit beeps This function is not used in the day to day operation of the appliance Remote co...

Page 9: ...let Copper flare union Gas Input 25 MJ h high and 16 MJ h low Gas Type NG only Weight 10 kg Before installation Unpack the appliance and components and check for damage DO NOT install any damaged items Check all components have been supplied and that you have the correct gas type Read these instructions to get an overview of the steps required before starting the installation Failure to follow the...

Page 10: ...equivalent For wood timber number 12 screws or equivalent 3 Remove lower surround panel Do not hang in the air as this will damage the electrical connections The unit must be hung between the left and right hand side surround panels to eliminate any pull on the electrical connections 4 Prepare to connect the gas remembering that a manual isolation valve must be fitted 5 Tighten all connections tur...

Page 11: ...____________________________________________________________________ ___________________________________________________________________________ Phone _______________________________ Mobile ______________________________ Certificate of Compliance number for installation ____________________________________ Signed ______________________________ Date _______________________________ 9 V 2 1 mm regula...

Page 12: ...NAI 746 624 Installers 0800 TO RINNAI 86 746 624 Address 105 Pavilion Drive Mangere Auckland PO Box 53177 Auckland Airport Auckland 2150 Phone 09 257 3800 Fax 09 257 3899 Email info rinnai co nz Website www rinnai co nz ...

Reviews: