Rinnai New Zealand Limited
Electronic Super Ray Operation and Installation:
10081-B 02-11
10
Installation Information
Procedure
1. Select a suitable position.
2. Unscrew the wall bracket from the rear of the heater using a 4 mm Allen key. The wall on
which the heater is mounted must be capable of supporting the heater - 10 kg.
Place wall bracket in position and mark fixing location holes on the wall. Ensure minimum
clearances as shown on page 4. The heater must be securely attached to the building or
structure using the following fixtures:
- For brick and masonry
8 mm dynabolt or equivalent
- For wood/timber
number 12 screws or equivalent
3. Remove lower surround panel. Do not hang in the air as this will damage the electrical
connections. The unit must be hung between the left and right hand side surround panels
to eliminate any pull on the electrical connections.
4. Prepare to connect the gas remembering that a manual isolation valve must be fitted.
5. Tighten all connections, turn on gas supply and check for leaks with a solution of soapy
water.
6. When the installation and testing is completed, explain to the customer about use and care
of the unit and understands the instructions. Leave these instructions with the customer.
Unscrew these screws to remove wall bracket
Remove and hang lower panel on the side
surrounds to safely access the gas connection