Rinnai 16 

EHPA Heat Pump OIM

TRANSPORT AND HANDLING

IMPORTANT

When moving the unit, it must be close to vertical at all times.  
When using a trolley to move the unit, ensure it is not tilted more than 45° from the vertical.
Non compliance will void warranty and severely affect product performance and operation

45°

Never tilt unit more than 45˚ from vertical

The Rinnai Enviroflo Electric Heat Pump must be transported at an angle no greater that 45º from vertical.  As the 

compressor unit is located at the top of the electric heat pump, should the heat pump be tilted at a greater angle 

than 45º from vertical, the lubrication oil within the compressor can run down into the mufflers. This will leave the 

compressor motor without sufficient lubrication and lead to premature failure of the compressor unit. 

As a general good practice it is better to keep the compressor upright as much as possible to avoid any risks. 

Returning the Rinnai Electric Heat Pump to a vertical position will not allow the oil to properly flow back into the 

compressor motor.  

Tilting  the  heatpump  beyond  45º  from  vertical  will  also  place  undue  strain  on  compressor  motor  mounts  and 

associated piping

POSITIONING THE HEAT PUMP

Arrive at site and conduct a safety audit  (Safety audits can also be known as Work Method Statements (WMS) or 

Job Site Analysis (JSA).
Park your vehicle as close as allowable to your installation. Unload all materials in a safe manner.
Position all materials in a convenient position near the work area.
The heat pump MUST BE installed outdoors, close to the most frequently used hot water outlet.

The location must consider noise impact on living areas. Avoid positioning near bedrooms or neighbours’ bedrooms. 

Although the running noise level is very low it can be expected that the heat pump will run during the night.
Adequate access must be available to the relief valve and anode.
Safely position the new unit on a level surface in accordance with all plumbing and building regulations.

A properly drained overflow tray must be used where property damage could occur from water spillage. (See AS/

NZS3500.4.2 for further details.)

NOTE

Do not drain on to grass or garden beds.
Do not commence a job where the risks cannot be controlled.

INSTALLATION

Summary of Contents for Enviroflo EHPA250VM

Page 1: ...8 Lic W00169 SAI Global N10378 This system shall be installed commissioned and serviced by an authorised person in accordance with Manufacturer s Instructions Current AS NZS 3500 All applicable local...

Page 2: ...ice Call 9 Specifications 11 System Specifications 11 Dimensions 12 Clearances 13 Installation 14 Regulations and Occupation Health and Safety OH S 14 Location 14 Water Supply 15 Storage Temperature 1...

Page 3: ...d by an authorised person in order to avoid a hazard Take care not to touch the power connections or plugs with wet hands Care should be taken not to touch the pipe work as it may be HOT DO NOT place...

Page 4: ...licable regulations IMPORTANT IMPORTANT DO NOT TILT MORE THAN 45 FROM VERTICAL 45 The Rinnai Enviroflo Electric Heat Pump must be transported at an angle no greater that 45 from vertical As the compre...

Page 5: ...r before bathing or showering yourself Supervise children whenever they are in the bathroom Make sure that the hot water tap is turned off tightly CONSIDER Installing child proof tap covers or child r...

Page 6: ...The heat pump unit includes a circulation pump which draws water from the bottom of the storage tank and returns it to the tank at a higher temperature A temperature sensor in the tank is used to con...

Page 7: ...the easing gear is closed attendance by an authorised person must be arranged without delay The PTR valve is not serviceable EXCESSIVE DISCHARGE FROM SAFETY DEVICES Pressure Temperature Relief PTR Va...

Page 8: ...ed below in the section the section Draining and Filling on page 8 TURNING ON THE WATER HEATING SYSTEM Switch on the electric supply to the heat pump unit Water heating will now occur as required It m...

Page 9: ...blem If the valve dribbles continuously try easing the valve gear for a few seconds as described in the section Excessive Discharge from Safety Devices on page 7 This may dislodge any foreign matter a...

Page 10: ...S One or more hot taps opened at the same time More than one or two hot taps in use at the same time may cause a decrease in the hot water flow from the taps Is there more than one or two hot taps ope...

Page 11: ...actory Wired 1 0 KW Total Rated Input To be wired by installer 3 4 KW Maximum Energy Output Use to size PTR 4 29 kW Power Supply 240 V AC 50 Hz Rated Current 15 A Refrigerant Type Mass R290 300 g Refr...

Page 12: ...HPA Heat Pump OIM DIMENSIONS EHPA250VM EHPA315VM Cylinder height 1872 2165 Hot Outlet PTR 1248 1541 Cold water inlet 210 210 Cylinder diameter 611 611 Height Diameter PTR Hot Outlet PTR Cold Inlet SPE...

Page 13: ...13 EHPA Heat Pump OIM CLEARANCES Allow 700mm on the fan discharge side and 150 mm clearance on the fan suction side to allow for sufficient air flow through the fan 700 mm 150 mm 700 mm 150 mm SPECIFI...

Page 14: ...the distance between the heat pump and the outlets is considerable a flow and return system can be used which minimize the waiting time for hot water delivery It is recommended that all components are...

Page 15: ...ry and secondary schools and nursing homes or similar facilities for young aged sick or people with disabilities and 50 C for all other buildings To comply with these requirements a temperature limiti...

Page 16: ...ck into the compressor motor Tilting the heatpump beyond 45 from vertical will also place undue strain on compressor motor mounts and associated piping POSITIONING THE HEAT PUMP Arrive at site and con...

Page 17: ...passage through the valve The PTR valve must be installed on the connection marked hot water outlet near the top of the cylinder Leave the valve outlet pointing down Tighten the valve using the spanne...

Page 18: ...Union Connection Non return Valve Line Strainer Cold Water Inlet Isolating Valve Spindle Vertical Cold water expansion control valve Connect the pipe work supplying hot water to the premises to the ho...

Page 19: ...NOT be activated until the system is filled with water The premises wiring to the heater must be capable of withstanding the appliance load Refer to specification table for load details All electrical...

Page 20: ...EARTH wire is securely fixed to the earth post provided on the heater case Inspect and ensure that all wiring links are secure prior to fixing the access cover and turning the POWER ON NEUTRAL EARTH C...

Page 21: ...Any remaining air will be bled from the automatic air vent If leaks are detected turn off power to the heat pump repair any leaks and repeat the filling process to remove any air If no leaks are dete...

Page 22: ...rated for the first time it runs through an initial heat up cycle allow time for the initial heat up cycle Depending on the ambient conditions this can take several hours Once its first heat up cycle...

Page 23: ...Discharge Sensor FAILURE Five Times Compressor Discharge Sensor 110 C Six Times Low Pressure Switch Open Seven Times High Pressure Switch Open Eight Times Under Voltage 190 V AC Nine Times Over Volta...

Page 24: ...ocal call higher from mobile or public phones Hot Water Service Line Tel 1800 000 340 Australia Pty Ltd ABN 74 005 138 769 Internet www rinnai com au E mail enquiry rinnai com au Rinnai has a Service...