![RINGSPANN HS 215 FHM Installation And Operating Instructions Manual Download Page 23](http://html.mh-extra.com/html/ringspann/hs-215-fhm/hs-215-fhm_installation-and-operating-instructions-manual_1462322023.webp)
Installation and operating instructions for
Brake HS 215 FHM spring activated
–
hydraulically released
E 09.777e
Issue: 28.05.2021
Version: 2
Drawn: BAHS
Checked: EISF Pages: 28
Page: 23
Procedure: For the other brake padside
1.
Fit a screw M10 into the stop plate 10 to facilitate gripping.
2.
Remove 1 reatining plate
10
Fig. 5.7
+ 8 screws
V08
+ 8 washers
V17
on the side where
the pad is to be removed.
3.
Fit a screw M8 (**) into the end of the pad 11 to facilitate gripping (recommended length:
60mm).
4.
Remove pad
11
from its pad holder
02
by pulling screw M8.
5.
Fit the new pad
11
in its housing. If necessary, use the screw M8.
6.
Loosen the screw M8.
7.
Reinstall stop plate 09 onto 01 with 8 screw V08 8 washer
V17
. Make sure the pin
19
is
correctly in the M8 hole in the pad.
8.
Loosen the screw M10 into the stop plate
10
.
9.
After the pads replacement, remove the manual release chapter 5.2 and proceed with the
adjustment of the pad gap chapter 5.3. Please note version R-V use adjustment screw
between the casing and the groundplate.
Tightening torque: Cs = 140Nm ±10%+ Loctite 243.
Note:
Check that the 8 screws
V18
located on the
opposite side are correctly torqued to
140Nm.