SAWMILL ASSEMBLY
1. UNPACKING
Unpack the contents of the crate except for the sawmill head and the two long boxes in the bottom
that
contain the two sections of track. Unbolt the front of the crate and lay 6” (150mm) high support
blocks in front of the crate. Bend the front of the crate down. Carefully lay the sawmill head and the
cardboard down onto the 6” (150mm) support blocks. Slide the sawmill head out of the crate as
shown below.
The two long track boxes may now be removed from the crate and the crate be placed out of the way.