background image

ITEM # PART #

DESCRIPTION

QTY.

A

Varies Track Assembly

1

B

52336 3/16" Aluminum Rivet Washer .198 x .510 x .067

2

C

52678 8-18X1/2 Phillips Pan Self Drill Screw

2

D

51708 M5 x 18mm (7/8") Sq/Ph/Wshr Head Wood Screw 

2

E

Varies LT U-channel

1

Page 8 OF 8

K&A Manufacturing

6703 Zinser Street Schofield,  WI  54476

Phone: 800.298.4351 

Fax: 866.882.9475

  www.raproducts.com

Instructions To Install a Track on a Series 4 
Workstation:

Step 1:  

Place the front of the track 

A

 against 

the bottom of the worksurface and the back of 
the track against the u-channel.

Step 2:  

Align the holes in the track 

A

 with one 

set of pilot holes in the u-channel 

E

 keeping 

the front of the track 1/8"-5/8" from the front of 
the worksurface.  Place (2) washers 

B

 on (2) 

self drilling screws 

C

 .  Drive them through the 

track and into the u-channel.

Step 3:  

Attach the front of the track 

A

 to the 

worksurface using (2) wood screws 

D

 .  Do 

not overtighten the screws.  Use a low torque 
setting on the power driver.

Step 4:  

Complete the installation using the 

instructions that came with the product you are
installing.

Troubleshooting:  

If the workstation leg assemblies are at uneven heights, it is usually 

caused by an improperly installed hex rod.  Disassemble one of the legs from the work-
surface and make sure both ends of the hex rod are properly engaged in the hex drives 
near the tops of the leg assemblies.

If you continue having problems with the table operation, contact RightAngle™
service at 800-298-4651 or [email protected].

Instruction # 53520

Side View

(Track will be at

an angle when 

installation is finished.)

A

B

C

D

E

E

A

Summary of Contents for NewHeights 4 Series

Page 1: ...53507 K A Manufacturing 6703 Zinser Street Schofield WI 54476 Phone 800 298 4351 Fax 866 882 9475 www raproducts com Version Dated 8 8 16 Read all the instructions before beginning NewHeights Series 4...

Page 2: ...1708 53638 5 8 52678 52336 B C 800394 9 Warranty Information NewHeights products are warranted to be free of defects due to manufacturing or materials as follows Three years on the gears Five years on...

Page 3: ...54476 Phone 800 298 4351 Fax 866 882 9475 www raproducts com Hardware Instruction 53520 Leg A Right Leg The drawing below shows how to distinguish the left leg A from the right leg B Leg B Left Leg F...

Page 4: ...Step 1 Lay the worksurface 1 on a protected surface with the pilot holes facing up There are metal inserts in the worksurface These should not be used for this workstation Place the right leg assembly...

Page 5: ...he worksurface Attach it with 4 wood screws 5 in the outside corners of the worksurface support Leave the screws loose by about 1 8 until the cross support is installed Step 4 Align the holes in the u...

Page 6: ...et screws 8 through the holes in the ends of the cross support 6 and thread them into the weld nuts that are held in place by the stickers Do not fully tighten Check that the cross support is level an...

Page 7: ...he work station upright in its final location Level the unit if required by turning the leveling glides clockwise from the top on the low corners of the workstation If your workstation has casters lev...

Page 8: ...orksurface Place 2 washers B on 2 self drilling screws C Drive them through the track and into the u channel Step 3 Attach the front of the track A to the worksurface using 2 wood screws D Do not over...

Reviews: