background image

Page 2 OF 8

K&A Manufacturing

6703 Zinser Street Schofield,  WI  54476

Phone: 800.298.4351 

Fax: 866.882.9475

  www.raproducts.com

Tools Required for Assembly:

Power Driver W/Adjustable Torque
#2 Phillips Head Driver Bit 
#2 Square Head Driver Bit
3/16" Hex Head Driver Bit or
Allen Wrench
Tape Measure
Level

Hardware Pack 53507

Hardware is Drawn Actual Size

Instruction # 53520

51708

53638

5

8

52678

52336

B

C

800394

9

Warranty Information:  

NewHeights™ products are warranted to be free of defects due

to manufacturing or materials as follows:  Three years on the gears.  Five years on the 
support brackets, aluminum columns and feet.  We will replace any defective part after 
inspection by an authorized agent.  Costs incurred due to product replacement such as
installation labor and transportation are not covered under this warranty.  When 
corresponding with RightAngle™ products, provide the model and serial numbers
located on one of the leg assemblies.

Summary of Contents for NewHeights 4 Series

Page 1: ...53507 K A Manufacturing 6703 Zinser Street Schofield WI 54476 Phone 800 298 4351 Fax 866 882 9475 www raproducts com Version Dated 8 8 16 Read all the instructions before beginning NewHeights Series 4...

Page 2: ...1708 53638 5 8 52678 52336 B C 800394 9 Warranty Information NewHeights products are warranted to be free of defects due to manufacturing or materials as follows Three years on the gears Five years on...

Page 3: ...54476 Phone 800 298 4351 Fax 866 882 9475 www raproducts com Hardware Instruction 53520 Leg A Right Leg The drawing below shows how to distinguish the left leg A from the right leg B Leg B Left Leg F...

Page 4: ...Step 1 Lay the worksurface 1 on a protected surface with the pilot holes facing up There are metal inserts in the worksurface These should not be used for this workstation Place the right leg assembly...

Page 5: ...he worksurface Attach it with 4 wood screws 5 in the outside corners of the worksurface support Leave the screws loose by about 1 8 until the cross support is installed Step 4 Align the holes in the u...

Page 6: ...et screws 8 through the holes in the ends of the cross support 6 and thread them into the weld nuts that are held in place by the stickers Do not fully tighten Check that the cross support is level an...

Page 7: ...he work station upright in its final location Level the unit if required by turning the leveling glides clockwise from the top on the low corners of the workstation If your workstation has casters lev...

Page 8: ...orksurface Place 2 washers B on 2 self drilling screws C Drive them through the track and into the u channel Step 3 Attach the front of the track A to the worksurface using 2 wood screws D Do not over...

Reviews: