21
20152093
GB
Installation
5.8
Combustion head pre-calibration
Proceed as follows:
remove the 8 screws 2)(Fig. 16);
remove the 4 round blocks 1) fastened behind the stability
disc.
5.9
Combustion head adjustment
At this point of the installation, the combustion head is fixed to the
boiler as shown in Fig. 13. It is therefore especially easy to adjust,
and this adjustment depends only on the maximum output of the
burner.
Two combustion head adjustments are available:
–
external air R1
–
central gas/air R2
In the diagram of Fig. 17, find the notch at which both air and
central gas/air should be adjusted.
ATTENTION
Combustion head must be pre-calibrated
exclusively for the model concerned, if its
maximum output is included in area B of the firing
rate (Fig. 2 on page 10).
1
2
Fig. 16
D2382
Fig. 17
1100 1300 1500 1700 1900
1200
2000
1800
1600
1400
2200
2100
2400
kW
Mcal/h
0
2
4
6
8
10
12
D8541
No. notches
Max burner output
Summary of Contents for RS 200/M BLU
Page 2: ...Translation of the original instructions ...
Page 51: ...49 20152093 GB Appendix Electrical panel layout 0 ...
Page 55: ......