background image

15

8  COMMONWEALTH OF MASSACHUSETTS

8.1  IMPORTANT INSTRUCTIONS FOR THE 

COMMONWEALTH OF MASSACHUSETTS

The Commonwealth of Massachusetts requires compliance with 

regulation 248 CMR 4.00 and 5.00 for installation of through – 

the – wall vented gas appliances as follows:

For  all  side  wall  horizontally  vented  gas  fueled  equipment 

installed in every dwelling, building or structure used in whole 

or  in  part  for  residential  purposes,  including  those  owned  or 

operated by the Commonwealth and where the side wall exhaust 

vent termination is less than seven (7) feet above finished grade 

in the area of the venting, including but not limited to decks and 

porches, the following requirements shall be satisfied:

1. INSTALLATION OF CARBON MONOXIDE DETECTORS

At  the  time  of  installation  of  the  side  wall  horizontal  vented 

gas fueled equipment, the installing plumber or gasfitter shall 

observe that a hard wired carbon monoxide detector with an 

alarm and battery back-up is installed on the floor level where 

the gas equipment is to be installed. In addition, the installing 

plumber  or  gasfitter  shall  observe  that  a  battery  operated  or 

hard wired carbon monoxide detector with an alarm is installed 

on each additional level of the dwelling, building or structure 

served by the side wall horizontal vented gas fueled equipment. 

It shall be the responsibility of the property owner to secure the 

services of qualified licensed professionals for the installation of 

hard wired carbon monoxide detectors.

a.

 In the event that the side wall horizontally vented gas fueled 

equipment  is  installed  in  a  crawl  space  or  an  attic,  the  hard 

wired carbon monoxide detector with alarm and battery back-

up may be installed on the next adjacent floor level.

b.

 In the event that the requirements of this subdivision can 

not be met at the time of completion of installation, the owner 

shall have a period of thirty (30) days to comply with the above 

requirements;  provided,  however,  that  during  said  thirty  (30) 

day period, a battery operated carbon monoxide detector with 

an alarm shall be installed.

2. APPROVED CARBON MONOXIDE DETECTORS

Each carbon monoxide detector as required in accordance with 

the above provisions shall comply with NFPA 720 and be ANSI/UL 

2034 listed and IAS certified.

3. SIGNAGE

A  metal  or  plastic  identification  plate  shall  be  permanently 

mounted to the exterior of the building at a minimum height of 

eight (8) feet above grade directly in line with the exhaust vent 

terminal for the horizontally vented gas

fueled heating appliance or equipment. The sign shall read, in 

print size no less than one-half (1/2) in. in size, “GAS VENT DIRECTLY 

BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.

4. INSPECTION

The  state  or  local  gas  inspector  of  the  side  wall  horizontally 

vented gas fueled equipment shall not approve the installation 

unless,  upon  inspection,  the  inspector  observes  carbon 

monoxide detectors and signage installed in accordance with 

the provisions of 248 CMR 5.08(2)(a)1 through 4.

(b) EXEMPTIONS

The  following  equipment  is  exempt  from  248  CMR  5.08(2)(a)1 

through 4:

The equipment listed in Chapter 10 entitled “Equipment Not 

Required To Be Vented” in the most current edition of NFPA 

54 as adopted by the Board; and 

Product Approved side wall horizontally vented gas fueled 

equipment installed in a room or structure separate from 

the dwelling, building or structure used in whole or in part 

for residential purposes.

(c) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING 

SYSTEM PROVIDED.

When  the  manufacturer  of  Product  Approved  side  wall 

horizontally vented gas equipment provides a venting system 

design or venting system components with the equipment, the 

instructions provided by the manufacturer for installation of the 

equipment and the venting system shall include:

Detailed instructions for the installation of the venting 

system design or the venting system components; and 

A complete parts list for the venting system design or venting 

system.

(d) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING 

SYSTEM NOT PROVIDED

When  the  manufacturer  of  a  Product  Approved  side  wall 

horizontally vented gas fueled equipment does not provide the 

parts for venting the flue gases, but identifies “special venting 

systems”, the following requirements shall be satisfied by the 

manufacturer:

The referenced “special venting system” instructions shall 

be included with the appliance or equipment installation 

instructions; and

The “special venting systems” shall be Product Approved by 

the Board, and the instructions for that system shall include 

a parts list and detailed installation instructions.

(e) A copy of all installation instructions for all Product Approved 

side wall horizontally vented gas fueled equipment, all venting 

instructions,  all  parts  lists  for  venting  instructions,  and/or  all 

venting design instructions shall remain with the appliance or 

equipment at the completion of the installation.

Summary of Contents for Residence PRO 32 KIS

Page 1: ...o do so may result in an explosion or fire WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your...

Page 2: ...TIONSHIPS 10 4 13 ACCESS TO THE INFO MENU 10 4 14 LIGHTS AND FAULTS RESET PROCEDURE 10 5 HOW TO 12 5 1 HOW TO INCREASE THE SYSTEM PRESSURE 12 5 2 HOW TO SHUT DOWN THE SYSTEM FOR SHORT PERIODS 12 5 3 H...

Page 3: ...an of the boiler WARNING There is a risk of pipes freezing if the building is left unattendedforlongperiodsoftime inexcessof12hrs infreezing temperatures In the event the building will be unoccupied f...

Page 4: ...ivez les instructions intitul es Comment couper l admission de gaz de l appareil et appelez un technicien qualifi ou le fourmisseur de gaz pour ouvrir pour fermer 1 R glez le thermostat la temp rature...

Page 5: ...ed in the burner flame whose information allows the control board to operate the gas valve that regulates the fuel This sophisticated control system provides the auto regulation of the combustion so t...

Page 6: ...3 Flame sensor 14 Manual air vent hose 15 Manual upper air vent valve 16 Flue temperature sensor 17 Positive air pressure tube 18 Flue outlet 19 Air intake 20 Negative air pressure tube 21 Air pressur...

Page 7: ...ssure is low and needs to be re pressureized Icons RESET MENU 136 F OK MODE Display SOME OF THE ICONS SHOWN ON THE CONTROL DEVICE SCREEN AT THE START UP PHASE MIGHT NOT BE AVAILABLE DURING FUNCTIONNIN...

Page 8: ...nician or gas supplier After completing all operations required to prepare commissioning proceed as with the instructions in sections 4 6 and 4 7 sequentially to complete lighting the boiler 4 6 PROGR...

Page 9: ...onds the value will be confirmed automatically 9 9CAUTION Adjusting your maximum heating setpoint past the design temperature of your heat emitters may cause minor injuries or property damage Consult...

Page 10: ...mostat is set too high 4 13 ACCESS TO THE INFO MENU 9 9NOTICE Make sure you are in the Operation mode backlight ON see section 10 6 Using the boiler control panel it is possible to access the INFO men...

Page 11: ...st purging for 45 seconds at the fan s maximum speed It is not possible to release the error before the end of the post purging unless the boiler s power supply is switched off E022 iono alarm E023 io...

Page 12: ...maintained until the outlet water temperature reaches 131 F 55 C 9 9NOTICE The activation of the ANTI FREEZE function is indicated by the icon displayed on the front control circulator anti seize the...

Page 13: ...technician This appliance produces carbon monoxide CO gases The venting should never be taken apart by anyone other than a qualified technician The venting should not be separated Failure to comply m...

Page 14: ...he boiler and purge all air from system 19 p Power boiler back on 20 p Verify the polarity and ground of the power supply L N 120v L G 0v N G 0v 21 p Check incoming power to spark generator 120 vac 22...

Page 15: ...terior of the building at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign sh...

Page 16: ...ce accident corrosive atmospheres physical damage to the boiler alterations by unauthorized service operation contrary to the Manufactures instructions including annual cleaning or if the serial numbe...

Page 17: ...17...

Page 18: ...18...

Page 19: ......

Page 20: ...387 4663 Email info egproductsolutions com Professional Resources egproductsolutions com The Company is constantly working to perfect all of its production processes therefore the aesthetics and size...

Reviews: