3445
5
3.2 BOILER FIXING
➤
Secure the flange to the burner as follows: fit the screw and the two nuts (see fig. 7) on the flange (1).
➤
Widen, if necessary, the insulating gasket holes (2,fig. 8), taking care not to damage them.
➤
Fix the flange (1) to the boiler door (5, fig. 9) interposing the insulating gasket (2), using the screws
(3) and (if necessary) the nuts (4).
3.3
BURNER ASSEMBLY
In the case of CF application, combustion air is fed through the
feeder unit (A).
In the case of BF application, combustion air is fed through a flexible
or rigid pipe connected to the air intake (B).
FOR CORRECT BF APPLICATION, THE BURNER MUST BE
INSTALLED ON AN APPROPRIATE BF BOILER.
Consequently, you must comply with the following requirements and
instructions:
➤
The combustion air intake tube must be:
- fastened securely to the burner;
- made of a suitable material, with temperature characteristics in
the range - 30 °C to 80 °C;
- in compliance with all requirements of applicable regulations in
force in the country of destination.
2
5
3
1
E9239
E9238
1
4
D5012
2
Fig. 7
Fig. 9
Fig. 8
3
D7015
A
S7011
B
CF APPLICATIONS
BF APPLICATIONS