INSTAllATION
10
fixing the metallic support to the wall:
1 Metal support
2 Spirit level
3 Fixing screw
4 Support wall
5 Wall plug
4
3
1
2
1
5
—
remove the metallic support from the unit rear side
—
mark the position of the fixing holes using the metallic
support as a template
—
drill holes in the marked positions
—
fix the metallic support with the screws and the wall plugs
9
Check that the installation is horizontal using a water level.
Drilling into the wall:
A Inner side
B Outer side
1 Hole protective insert, supplied
2 Plastic tube
5 - 6 mm
A
1
2
B
—
drill the through hole into the wall
—
keep a downward inclination toward the external side
—
insert a plastic tube in the hole in order to protect the con-
nections
—
introduce the supplied hole protection insert on the inter-
nal side of the wall
—
seal with stucco
9
In case of connections on the rear side of the unit, refer to
chapter "Refrigerating connection"
p. 11 for the position
of the hole.
leak test:
The unit is supplied as pre-charged with nitrogen.
1 Liquid pipe
2 Gas pipe
3 Gas connection plug
4 Pressure presence indicator
5 Fluid connection plug
1
2
3
4
5
—
ensure that pressure presence indicator is protruding
—
partially loosen one fitting plug
—
check for nitrogen leaks to verify that there is pressure in-
side the device
9
If pressure indicator is not protruding, do not continue in-
stallation and check for leakage inside the unit.
9
Contact
R
Technical Support Service.
Device preparation:
1 Motor-driven deflector locking insert (model 50 - 70 only)
1
—
remove the motor-driven deflector locking inserts
Summary of Contents for R32 Series
Page 27: ......