20
INSTALLATION
9
If a confirmation solenoid valve is to be installed in the light
oil supply circuit to the burner, only a one-pipe system can
be set. Any two-pipe connection can compromise the cor-
rect operation of the burner.
H (m)
L (m)
Øi (8mm)
Øi (10mm)
0
35
100
0,5
30
100
1
25
100
1,5
20
90
2
15
70
3
8
30
3,5
6
20
H
= Height difference
L
= Maximum length of suction hose
Øi
= Internal diameter of hose
1
Suction port
2
Return
3
By-pass screw
4
Pressure gauge fitting
5
Pressure adjuster screw
6
Vacuum gauge fitting
7
Solenoid valve
8
Auxiliary pressure measurement fitting
7
6 5
4
3
2
1
8
2.10
Discharge of combustion products
The flue pipe (1) and the connection to the stack (2) must be
made in conformity to the laws, standards and regulations ap-
plicable in the place of installation.
2
≥5°
1
3
9
The condensate drain system (3) must conform to national
and local legislation and standards.
9
The stack fitting is equipped with a seal (A). Do not use pipes
with riveted overlaps to construct the flue.
A
Øi 80
205
65
INSIEME EVOe 25 B/70 LN
boilers derive their comburent air from
the room in which they are installed. Suitable air vents must
therefore be provided in compliance with applicable laws and
standards.