30
INSTALLATION
Multiple Boiler Piping Schematic with Sequencing Panel
SP
16
16
13
14
15
8
19
19
8
17
16
16
17 16
19 17
17
16
16
16
16
15
6
3
3
11
3
3
3
3
10
9
5
7
7
7
3
3
3
TC
8
18
4
3
5
4
3
10
12
3
3
1
1
1
FLOW
FLOW
FLOW
MAKE-UP
WATER
WATER
INLET
LT (*)
CENTRAL
HEATING
RETURN
HT (*)
CENTRAL
HEATING
RETURN
LT
RETURN (**)
LT
RETURN (**)
LT
RETURN(**)
HT
RETURN
HT RETURN
HT RETURN
CENTRAL
HEATING
SUPPLY
20
2
2
2
1 Boiler
2 Burner
3
Isolation valves
4
Central heating system pump
5
Non-return valves
6
Automatic vent valve
7
Boiler safety valve
8
Boiler drain valve
9
Y strainer
10
Pressure reducer
11
Expansion tank
12
Water softener filter
13 Siphon
14
Condensate outlet
15 Drain
16
Isolation valve
17
Non-return valve
18
Air separator
19
Motorized isolation valve
20
Pressure gauge
SP
Sequencing panel
TC
Control temperature
. _ . _ . Electrical signal
(*)
LT= Low Temperature/HT= High Temperature
(**)
On the
RTC 1000-80
to
RTC 4700-80
the low
temperature heating return is located on the top
of the boiler. See "Single Boiler Piping Schematic
Type A".
Summary of Contents for 20165080
Page 1: ...cod 20158857 rev 2 02 2020 RTC 80 1000 5500 USA INSTALLATION OPERATION AND SERVICE MANUAL...
Page 53: ...53...
Page 54: ...54...
Page 55: ...55...