15
INSTALLATION
2.3
Moving and removing the packaging
9
Wear suitable personal protection equipment when moving
the boiler and removing the packing. Only use lifting equip-
ment that is suitable for the weight involved.
The product can be moved in two ways:
− using a hoist of suitable lifting capacity;
− using a fork lift of suitable lifting capacity.
Two lifting points (A) are provided at the top of the boiler body for
use with a hoist.
9
Move the boiler to its place of installation, using equipment of
suitable lifting capacity.
A
0
CAUTION
: Do not dispose of packaging material into the envi-
ronment, or leave it within the reach of children, since it can
become a potential hazard. Dispose of packaging material in
compliance with the applicable legislation.
− for lifting using a rigging crane, use only the lifting provi-
sions supplied.
− when lifting the boiler using chains, make sure that at least
two chains are load-bearing. Lift up very carefully.
− maintain less than a 45 degree angle with the vertical
when lifting the boiler with chains or cables.
− the rigging crane must be operated by trained personnel.
9
WARNING
: Risk of injury from carrying heavy loads and inade-
quately securing loads for transport.
− Use suitable means of transportation, e.g. several pallet
trucks, a forklift truck, crane or heavy duty rollers
− secure the load against falling.