SETTING THE COMBUSTION HEAD

Combustion head adjustment depends exclu-
sively on MAX output generated by the burner in
stage 2. 
This value must therefore be set before adjusting
the combustion head.
Two head settings are available, i.e. the gas set-
ting and the air setting. These are made with the
burner open (fig. A), when securing the burner to
the boiler.

Gas adjustment 
- Loosen screw 3)(B).
- Rotate the ring nut 2) so that indicator 5) coin-

cides with the required notch 4). 

- Fasten screw 3).

Air adjustment
- Loosen the two screws 6)(B).
- Move the elbow 1) forwards or backwards so

that its rear surface 7) coincides with the re-
quired notch on the plate 8). 

- Fasten the screws 6).

Important: 
the notch number is the same for gas and air and
is taken from graph (C) according to the output
at which the burner is set in stage 2.

Example:
a GAS 3/2 burner is installed on a 240 kW boiler.
If a 90 % efficiency rate is considered, the burner
should deliver approximately 270 kW in stage 2. 
Graph (C) indicates that for this capacity, the gas
and air should be set on notch 4.5.

N.B.
The graph indicates the optimum ring nut 2)(B)
setting. If mains pressure is very low and does
not permit the required pressure (and so the re-
quired output), the ring nut may be opened by a
further 1-2 notches. See also the note on page
13.

Lastly, close the burner as follows:
- Slide unit A along the two slide bars 2)(A)
- Replace the screws 1)

Important:
when fitting the burner on the two slide bars, it is
advisable to gently draw out the high tension ca-
ble and flame detection probe cable until they
are slightly stretched. 

REGLAGE TETE DE COMBUSTION

Le réglage de la tête de combustion dépend uni-
quement de la puissance MAX développée par
le brûleur en 2ème allure.
Par conséquent, avant de régler la tête de com-
bustion, il faut déterminer cette valeur.
On a prévu deux réglages de la tête:
celui du gaz et celui de l'air. Ils s'effectuent avec
le brûleur ouvert, fig. (A), au moment de la fixa-
tion du brûleur à la chaudière.

Réglage gaz
- Desserrer la vis 3)(B).
- Tourner la bague 2) de façon à ce que l'index

5) coïncide avec l'encoche désirée 4).

- Bloquer la vis 3).

Réglage air
- Desserrer les deux vis 6)(B).
- Déplacer le coude  1) en avant ou en arrière de

façon à ce que son plan arrière 7) coïncide
avec l'encoche désirée sur la plaquette 8).

- Bloquer les vis 6).

Attention: 
le numéro de l'encoche pour le gaz et l'air est le
même et est déduit du diagramme (C) selon la
puissance à laquelle le brûleur est réglé en
2ème allure.

Exemple:
le brûleur GAS 3/2, installé sur une chaudière de
240 kW avec un rendement de 90 %, devra pro-
duire environ 270 kW en 2ème allure.
Du diagramme (C) on déduit que pour cette puis-
sance les réglages du gaz et de l'air doivent être
effectués sur l'encoche 4,5 environ.

Note
Le diagramme indique le réglage idéal de la tête
2)(B). Si la pression dans le réseau d'alimenta-
tion du gaz est très basse et ne permet pas d'at-
teindre la pression (et donc la puissance) désiré,
il est possible d'ouvrir ultérieurement la bride de
1 ou 2 encoches. 
Voir également la note page 13.

Pour finir, fermer le brûleur:
- Faire glisser le groupe A sur les deux guides

2)(A).

- Remettre les vis 1).

Attention:
au moment de la fermeture du brûleur sur les
deux guides, il faut tirer délicatement vers l'exté-
rieur le câble de haute tension et le petit câble de
la sonde de détection flamme, jusqu'à ce qu'ils
soient légèrement tendus.

Summary of Contents for GAS 3/2

Page 1: ...Forced draught gas burners Br leurs gaz air souffl 2915656 3 CODE MODELL MODEL MODELE TYP TYPE 3752117 GAS 3 2 521 T1 3752217 GAS 4 2 522 T1 3752317 GAS 5 2 523 T1 3752417 GAS 6 2 524 T1 3752517 GAS 7...

Page 2: ...tput 31 2 1st stage output 31 3 2nd stage output 33 4 Air pressure switch 33 5 Minimum gas pressure switch 33 Flame present check 33 Burner operation 35 Final checks 37 Maintenance 37 Fault Probable c...

Page 3: ...stdruchsatz Nm3 h 35 41 47 54 66 77 105 122 176 205 Druck bei H chstdruchsatz 2 mbar 11 1 16 4 9 8 14 5 9 8 14 5 12 3 18 2 14 5 21 4 BETRIEB Aussetzend min 1 Halt in 24 Stunden Zweistufig hohe und nie...

Page 4: ...elivery Nm3 h 35 41 47 54 66 77 105 122 176 205 Pressure at maximum delivery 2 mbar 11 1 16 4 9 8 14 5 9 8 14 5 12 3 18 2 14 5 21 4 OPERATION Intermittent min 1 stop in 24 hours Two stage high and low...

Page 5: ...0 71 0 78 0 71 0 78 0 71 0 78 d bit maximum Nm3 h 35 41 47 54 66 77 105 122 176 205 pression au d bit max 2 mbar 11 1 16 4 9 8 14 5 9 8 14 5 12 3 18 2 14 5 21 4 FONCTIONNEMENT Intermittent 1 arr t min...

Page 6: ...dem Gebl se einge baut wird Es bezweckt das Wiederanfahren des Bren ners der sich nach dem Abschalten der Flamme unter Dauerk hlung befindet A A1 COD 3000605 L 185 L 320 mm GAS 3 2 A2 COD 3000606 L 1...

Page 7: ...fire again after it has remained under continuous ventilation fol lowing flame cut out ACCESSOIRES sur demande A KIT POUR ALLONGER LA TETE DE COM BUSTION L Longueur standard L1 Longueur pouvant tre ob...

Page 8: ...ah men geliefert der f r die Handhabung mit Hub wagen geeignet ist Das Gesamtgewicht des Brenners einschlie lich Verpackung ist aus B zu ersehen ABMESSUNGEN C Richtwerte Die Brennerabmessungen sind in...

Page 9: ...Heat shield 1 Instruction booklet 1 Spare parts list DESCRIPTION BRULEUR A 1 Guides pour ouverture br leur et inspection de la t te de combustion 2 T te de combustion 3 Volet d air ferm l arr t pour r...

Page 10: ...von 5 mbar eine Leistung von 250 kW ent wickelt befindet sich der Arbeitswert auf der H chstdruck Kurve Bei der Definition dieser Kurve wurde ein Sicherheitsspielraum belassen daher kann der gesamte...

Page 11: ...i contre En fonctionnement la puissance du br leur varie entre une PUISSANCE MINIMUM en 1 re allure et une PUISSANCE MAXIMUM en 2 me allure La PUISSANCE MINIMUM MIN doit tre choisie dans la gamme des...

Page 12: ...N herung der tat s chliche Durchsatz wird am Z hler abgelesen Will man hingegen den an der Entnahmestelle 12 A S 8 erforderlichen Gasdruck bei Kenntnis der gew nschten Leistung des Brenners in der 2 S...

Page 13: ...sations CHAUDIERE D ESSAI A Les plages de puissance de la page 6 ont t tablies sur des chaudi res d essai sp ciales selon la norme EN 676 Nous reportons sur fig A le diam tre et la lon gueur de la cha...

Page 14: ...de gem C in der richtigen Stellung sind Dann den Flammkopf vom brigen Brenner ab trennen indem man die Schrauben 1 B und 2 l st und das Gebl se 4 aus den Gleitschie nen 3 zieht Das Flammrohr 6 an der...

Page 15: ...le the fan 4 B on the slide bars 3 replace the screws 2 and with the burner open set the combustion head INSTALLATION PLAQUE CHAUDIERE A Percer la plaque de fermeture de la chambre de combustion comme...

Page 16: ...in der 2 Stufe eingestellt wird Beispiel der Brenner GAS 3 2 ist an einem 240 kW Kes sel angebracht Bei einem Wirkungsgrad von 90 mu der Brenner ca 270 kW in der 2 Stufe abgeben Aus dem Diagramm C geh...

Page 17: ...d REGLAGE TETE DE COMBUSTION Le r glage de la t te de combustion d pend uni quement de la puissance MAX d velopp e par le br leur en 2 me allure Par cons quent avant de r gler la t te de com bustion i...

Page 18: ...C STR MUNGSVERLUST GASARMATUR L bei Brennerh chstleistung ZEICHENERKL RUNG TABELLE A C T Dichtheitskontrolleinrichtung der Gas ventile 8 9 Gasarmatur ohne Dichtheitskontroll einrichtung die Einrichtu...

Page 19: ...st Note See the accompanying instructions for the ad justment of the gas train LIGNE ALIMENTATION GAZ La rampe peut arriver par la droite ou par la gauche selon les cas Les lectrovannes 8 9 du gaz doi...

Page 20: ...ICHENERKL RUNG SCHEMEN A B C Kondensator CMV Motorkontaktgeber F1 Funkentst rer MMI 813 Steuerger t MB Klemmenbrett Brenner MV Gebl semotor PA Luftdruckw chter RT berstromausl ser SM Stellantrieb SO I...

Page 21: ...tor SO Ionisation probe SP Plug socket TA Ignition transformer TB Burner ground INSTALLATION ELECTRIQUE r alis e en usine SCHEMA A Br leurs GAS 3 2 4 2 monophas s SCHEMA B Br leurs GAS 5 2 6 2 7 2 tri...

Page 22: ...Elektroanschlu der Brenner GAS 3 2 4 2 mit Dichtheitskontrolle der Gasventile RG1 CT RIELLO oder LDU 11 LANDIS Die Dichtheitskontrolle der Gasventile 8 9 S 18 erfolgt umgehend vor jedem Brennerstart Z...

Page 23: ...ve stage 1 VR2 Gas valve stage 2 VS Safety valve XP Plug for leak detection control device RACCORDEMENT ELECTRIQUE effectu par l installateur Utiliser des c bles flexibles selon la norme EN 60 335 1 s...

Page 24: ...230 V betr gt den Motoranschlu Stern oder Drei eck schaltung und die Einstellung des ber stromausl sers ver ndern Die Brenner GAS 3 2 4 2 5 2 6 2 7 2 sind f r intermittierenden Betrieb typgepr ft Das...

Page 25: ...ting the wires will make the burner go into lock out because of firing failure SCHEMA A Alimentation triphas e Branchement lectrique br leurs GAS 5 2 6 2 7 2 sans dispositif de contr le d tanch it SCH...

Page 26: ...und entscheidet den Moment der Erregung des Gasventils der 2 Stufe Er f hrt eine H chstdrehung von 90 in 5 s aus Er ist mit 7 Nocken ausger stet die mit 4 farbi gen Hebeln regulierbar sind Ein Skalens...

Page 27: ...In this case the air gate valve follows lever movement REGLAGES AVANT L ALLUMAGE Le r glage de la t te de combustion air et gaz a d j t d crit page 16 Les autres r glages effectuer sont les sui vants...

Page 28: ...osition der Klappe in der 2 Stufe anzun hern schwarzen Hebel nach links drehen um den Zeitpunkt der ffnung zu distanzieren He bel nach rechts drehen Zusammenfassend kann man also sagen da die Aktion d...

Page 29: ...Levier orange D termine la position du volet d air 3 A p 8 quand le br leur fonctionne en 1 re allure Pour ouvrir le volet d placer le levier orange vers la gauche signe sur la plaque pour fer mer le...

Page 30: ...sung der Z ndleistung Den Steckkontakt 15 A S 8 vom Kabel der Io nisationssonde abtrennen der Brenner schal tet ein und geht nach der Sicherheitszeit in St rabschaltung 10 Z ndungen mit darauffolgende...

Page 31: ...ge optimal du br leur il faut effectuer l analyse des gaz d chappement de la combustion la sortie de la chaudi re R gler en succession 1 Puissance l allumage 2 Puissance br leur en 1 re allure 3 Puiss...

Page 32: ...ellten Druckwertes zu r ckdrehen und den Brenner wieder anfahren um zu berpr fen ob dieser ordnungsgem ar beitet Sollte eine St rabschaltung eintreten den Dreh knopf ein bi chen wieder noch zur ckdreh...

Page 33: ...e 2 me allure S il faut l augmenter ouvrir d abord enti rement la vanne du gaz de 2 me allure et ensuite si a ne suffit pas augmenter la pression du gaz la sortie du r gulateur de pression R glage air...

Page 34: ...geht die Steuerung des Stellmotors zur TR Fern steuerung ber die Temperatur oder den Druck im Kessel ber wacht Punkt E Das Steuerger t berwacht weiterhin das Vor handensein der Flamme sowie die richt...

Page 35: ...ly go out during op eration the burner will lock out within 1s FONCTIONNEMENT BRULEUR DEMARRAGE BRULEUR A 0s Fermeture t l commande TL Le cycle de d marrage du coffret de s curit est commenc 9s D marr...

Page 36: ...S 16 ausbauen Gebl se berpr fen ob sich im Gebl se oder auf den Laufradschaufeln Staub angeh uft hat das hat eine Minderung des Luftdurchsatzes zur Folge und verursacht eine umweltbelastende Verbren...

Page 37: ...INAUX br leur en fonction nement D brancher un fil du pressostat de seuil mini mum gaz Ouvrir la t l commande TL Ouvrir la t l commande TS Le br leur doit s arr ter D brancher le fil commun P du press...

Page 38: ...afo Auswechseln 31 Falsche Elektroanschl sse Ventile oder Trafo Kontrollieren 32 Defektes Steuerger t Auswechseln 33 Ein Ventil vor den Gasarmaturen geschlossen ffnen 34 Luft in den Leitungen Entl fte...

Page 39: ...deformed by high temperature Replace and protect 30 Ignition trasformer defective Replace 31 Erroneous valve or trasformer electrical connections Check 32 Control box defective Replace 33 A cock down...

Page 40: ...nsformateur d allumage d fectueux Le remplacer 31 Branchements lectriques vannes ou transformateur mal faits Les contr ler 32 Coffret de s curit d fectueux Le remplacer 33 Une vanne en amont de la ram...

Page 41: ......

Page 42: ......

Page 43: ......

Page 44: ...RIELLO S p A Via degli Alpini 1 I 37045 Legnago VR Tel 39 0442 630111 Fax 39 0442 630375 http www rielloburners com nderungen vorbehalten Subject modifications Sous r serve de modifications...

Reviews: