3. Replacement and Adjustment
Special Tools
Make sure that engineers are equipped with the following tools, which will be necessary in order to
update the firmware, and to perform adjustments that are necessary after replacing the main board
(page 49 "Main board assembly").
1. USB Cable mini USB to USB (A)
2. Laptop
3. LAN Cable
31
Summary of Contents for Hadar-PJ1 Series
Page 1: ...Model Hadar PJ1 Machine Codes Y088 089 090 091 Field Service Manual July 2015...
Page 2: ......
Page 10: ...8...
Page 11: ...1 Product Information Overview Main Unit 1 LED indicators 2 Remote receiver 9...
Page 24: ...1 Product Information 22...
Page 32: ...2 Installation 30...
Page 46: ...Left Cover 1 Front cover page 42 Front Cover 2 Left cover A 3 3 Replacement and Adjustment 44...
Page 48: ...4 Remove the top blower duct A 2 5 Blower fan A 2 1 3 Replacement and Adjustment 46...
Page 71: ...10 Remove the PSU holder A 3 11 Adjustable feet page 36 Adjustable Foot Part Replacement 69...
Page 78: ...4 Troubleshooting 76...
Page 92: ...5 Test Inspection 90...
Page 95: ...4 Click Next 5 Click Next 6 Click Next Firmware Update 93...
Page 111: ...Network Firmware Update 109...
Page 112: ...MEMO 110...
Page 113: ...MEMO 111...
Page 114: ...MEMO 112 GB...