background image

Series Series 

KNAR/F, KNARP/F, KNAR-D/F, KNARP-D/F,

 

Page 12

 

 

 

KNAR-S/F, KNARP-S/F   

ASME

 

 

9520-082-en 

Revision   14 

TM 9549

 

Edition   11/2017 

9  Maintenance 

  All  repair  work  is  to  be  performed  by  qualified 

personnel using the appropriate tools. 

  For  the  arrangement,  designation  and  item 

numbers of all parts of the valve, see 

Section 10

.  

  Spare parts are to be ordered with all the details 

in acc. with the valve identification. 

  Only original spare parts may be installed. 

  To prevent leaks, a regular check of the connec-

tion screws should be made in line with the oper-

ating requirements. 

For torques see 

Section 1.3

 

 

9.1  Dismantling 

 

9.1.1  Ball valve with lever 

  Remove lever 

203.

 

  Take out grounding spring washer 

557

  Dismantle packing gland follower 

503

 and spring 

gland follower 

502

  The  thrust  ring 

405/1

,  packing  bellows 

403

  and 

retaining  washer 

526

  (not  in  6"  and  8")  are  one 

unit and it is levered out using 2 screwdrivers. 

  Undo  screw  connection  body  end  piece 

102

  / 

main body 

100

  Remove body end piece 

102

  Remove  V-control  ball/stem  unit 

201

.  Pay 

attention so as not to damage the body lining. 

  Remove seat rings 

401

 

 

9.1.2  Packing bellows  

  Remove retaining washer 

526

  Separate  thrust  ring 

405/1

  and  packing  bellows 

403

 by pushing them apart. 

 

 

9.1.3  Ball valve with actuator 

  Undo setscrew 

904/4

 in the coupling 

804

 by one 

turn. 

  Undo sleeve nut 

512

 on the coupling by about 2 

turns.  Left-hand  thread.  Observe  drawing  in 

Sections 10.3 and 10.5

  Remove actuator 

850

 and coupling 

804

  Dismantle packing gland follower 

503

 and spring 

gland follower 

502

  Remove bracket 

510

Further  dismantling  is  performed  as  described  in 

Section 9.1.1

 

9.2  Assembly  

  Prior to assembly all parts are to be cleaned and 

the plastic-lined components checked for damage. 

  Insert  seat  rings 

401

  in  the  main  body 

101

  and 

body end piece 

102

  Mount and adjust V-control ball/stem unit 

201

. Pay 

attention so as not to damage the body lining. 

  Notice the direction of flow. See sectional  drawing 

in 

Section 10

  An  additional  bore  in  the  ball/stem  unit,  e.g.  to 

ensure it is cavity-free, must lie on the p1 side in 

the closed position.  

  Mount  body  end  piece 

102

.  Tighten  the  body 

screws to a tightening torque according to 

Section 

1.3

 in diametrically opposite sequence. 

 

 

9.2.1  Packing bellows  

  Press thrust ring 

405/1

 into packing bellows 

403

  Install retaining washer 

526

 (not in 6" and 8"). 

  Press unit into body end piece 

102

  Press in grounding spring washer 

557

 

 

9.2.2  Ball valve with lever 

  Mount lever stop 

577

, spring gland follower 

502

 (in 

3", 4", 6" and 8" are 2 spring gland followers 

502

and  packing  gland  follower 

503

.  Tighten  packing 

nuts until there is no gap between packing gland 

follower  and  spring  gland  follower.  See 

Section 

1.2 and 10

  Notice direction of rotation of V-control ball/stem. 

  Seal any tapped bores still open with plugs. 

  Mount lever 

203

 

 

9.2.3  Ball valve with actuator 

  Mount spring gland follower 

502

 (in 3", 4", 6" and 

8" are 2 spring gland followers 

502

) and packing 

gland  follower 

503

.  Tighten  packing  nuts  until 

there  is  no  gap  between  packing  gland  follower 

and spring gland follower.  

See 

Section 1.2 and 10

  Mount bracket 

510

 with the opening at right angles 

to the direction of flow. 

  Mount  coupling 

804

  and  actuator 

850

.  Notice 

direction of rotation of V-control ball/stem unit 

201

  Observe  the actuator  position  in accordance with 

the actuator operating manual. 

Summary of Contents for V&A KNAR-D/F

Page 1: ...n and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik GmbH 9520 082 en Revision 14 Edition 11 2017 Series KNAR F K...

Page 2: ...12 9 2 Assembly 12 9 2 1 Packing bellows 12 9 2 2 Ball valve with lever 12 9 2 3 Ball valve with actuator 12 9 3 Conversion from lever to actuator 13 10 Drawings 13 10 1 Legend 13 10 2 Sectional drawi...

Page 3: ...N EN 1563 0 7043 DIN 1693 and ASTM A395 KNAR S F KNARP S F 316 investment cast CF8M 1 4408 Lining material PFA PTFE F On request antistatic F L highly permeation resistant F P Temperature range See pr...

Page 4: ...ents The end of the stem journal or flat pivot point is marked with direction of flow flow rate Kvs and Cv lining material As viewed from above closing is in clockwise direction 1 3 Tightening torques...

Page 5: ...ve it is imperative to observe the max admissible breakaway torque 1 5 Cavitation coefficient z for 75 duty Cv Cv100 0 75 There are at least 3 different V control ball stem units for each nominal size...

Page 6: ...en used in the area of application of ASME the low temperature of ASTM A395 is limited to 20 F 29 C A special material is used for the ball stem unit for operating limits under 14 F to 76 F 10 C to 60...

Page 7: ...are suitable for vapours gases and non boiling liquids of group 1 according to the PED and have a corrosion resistant plastic lining Solids can lead to increased wear damage to sealing surfaces or to...

Page 8: ...ing evacuation and filling the formation of an explosive atmosphere must be prevented e g by superimposing a layer of nitrogen It is recommended to wait 1 hour before removing the valve from the plant...

Page 9: ...ly after delivery it must be put into proper storage It should be stored in a dry vibration free and well ventilated room at as constant a temperature as possible Elastomers are to be protected agains...

Page 10: ...by different measures e g a cable link At the customer s request a setscrew M6 with a hex nut and washer will be provided at each flange as an additional grounding connection The V control ball stem...

Page 11: ...o fails to stop the leak dismantle and inspect the valve Flange connection main body body end piece is leaking Retighten body screws See paragraph Flange connection valve pipe is leaking Packing is le...

Page 12: ...smantling is performed as described in Section 9 1 1 9 2 Assembly Prior to assembly all parts are to be cleaned and the plastic lined components checked for damage Insert seat rings 401 in the main bo...

Page 13: ...oing so observe direction of rotation of the v control ball stem unit Observe the actuator position in accordance with the actuator operating manual Tighten setscrew 904 4 in the coupling 804 Tighten...

Page 14: ...AR F KNARP F KNAR D F KNARP D F Page 14 KNAR S F KNARP S F ASME 9520 082 en Revision 14 TM 9549 Edition 11 2017 10 2 Sectional drawing ball valve with lever Holes of the flange and housing screws view...

Page 15: ...F KNARP F KNAR D F KNARP D F Page 15 KNAR S F KNARP S F ASME 9520 082 en Revision 14 TM 9549 Edition 11 2017 10 3 Sectional drawing ball valve with actuator Holes of the flange and housing screws vie...

Page 16: ...View and section ball valve with lever View Z Section B B 10 5 View and section ball valve with actuator Section A A Coupe B B Section B B Tighten packing gland follower 503 until spring gland followe...

Page 17: ...th lever KNAR F x x x x x x x x KNAR S F x x x DN 1 1 2 3 4 6 8 L inch mm 5 12 130 5 91 150 5 0 127 6 5 165 7 0 178 7 99 203 9 01 229 10 51 267 17 99 457 HL inch mm 7 05 179 10 24 260 12 32 313 20 27...

Page 18: ...3 77 3 15 80 4 64 118 5 27 134 7 24 184 H2 inch mm 2 32 60 2 32 60 3 15 80 3 94 100 H3 inch mm H4 inch mm L inch mm 5 12 130 5 91 150 5 0 127 6 5 165 7 0 178 7 99 203 9 01 229 10 51 267 17 99 457 L1 i...

Page 19: ......

Page 20: ......

Page 21: ...r Betriebsanleitung Insbesondere sind regelm ige Wartungsintervalle durchzuf hren und die dichtheitsrelevanten Schraubverbindungen zu berpr fen und wenn notwendig nachzuziehen meets the requirement re...

Page 22: ...129 FIT SD 14 FIT DU 108 FIT DD 36 FIT SFF 62 5 PFDAvg 4 73 10 4 for TProof 1 year MTBF 398 years Safety Intigrity Level SIL 2 Usable lifetime According to IEC 61508 2 7 4 7 4 values of up to 10 years...

Page 23: ...tamination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the r...

Page 24: ...ich cleaning method radioactive 3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with documented evidence...

Page 25: ...The laws are such as the Health and Safety at Work Act ArbSt ttV the Ordinance on Harzadous Substances GefStoffV BIOSTOFFV the procedures for the prevention of accidents as well as regulations to env...

Page 26: ......

Page 27: ......

Page 28: ...ion 14 9520 082 en Richter TM Richter Chemie Technik GmbH IDEX TM IDEX Corporation JOHANNESBURG Tel 011 397 2833 DURBAN Tel 031 579 2593 South Africa 0861 103 103 E mail sales valve co za www valve co...

Reviews: