9
Revision 28
Please ensure that the motor power cable is not plugged in at any stage before Step 9
Step 1
– Gate Preparation Before Adding
Your Sliding Gate Motor:
•
Ensure that the sliding gate is correctly installed.
•
The gate is horizontal and level and the gate can glide back and forth smoothly
when moved by hand before installing the automatic gate opener.
•
Wheels and guide rollers should rotate easily and be free from dirt/grime.
•
Track should be flat, level and firmly affixed.
•
Any misalignment in the gate will affect performance of the automatic gate
opener.