Installation
©
Rice Lake Weighing Systems
●
All Rights Reserved
17
2.12.2 Connect to the Indicator
The indicator cord grip is used to route the main cable from the junction box to the indicator.
Figure 2-18. Indicator Wiring Board Location
1. Determine the indicator’s load cell input connections from the indicator manual (
).
2. Run a cable from the indicator to the junction box through the cord grip.
Figure 2-19. JB4SS Junction Box
3. Strip the wire insulation 1/4 in to expose the wire.
4. Push in and hold the quick-connect lever with a small screwdriver.
5. Insert the appropriate wires into the wire openings.
6. Release the screwdriver to allow the spring-loaded gate to close and lock the wires in place.
2.12.3 Liquid Protection
If cables could be exposed to water or other liquids, bend a short downward loop in all cables near the cord grips so any fluids
draining down the cables will drip off before reaching the junction box.
Figure 2-20. Drip Loop Cable
All load cell cables need to be safely attached to proper locations to prevent loose wiring. Failure to correctly
attach will provide a safety hazard to the environment.
JPPP
PT4
T3
JP3
JP2
PT1
1
PT2
1
1
1
1
1
-EX
-SI
SHD
+SI
+EX
-SI
+SI
+EX
-EX
-SI
SHD
+SI
+EX
-EX
-SI
SHD
H
H
+SI
+SI
-SI
-EX
SHD
-EX
SHD
+EX
+SE
SS
-SE
+EX
XP
1
IND
-SI
+SI
-EX
SHD
+EX
+SE
-SE
Indicator Wiring Location
Indicator Cord Grip
IMPORTANT