![Rice Lake DHH-10 Operation Manual Download Page 7](http://html1.mh-extra.com/html/rice-lake/dhh-10/dhh-10_operation-manual_1454139007.webp)
Assembly
© Rice Lake Weighing Systems
●
All Rights Reserved
3
2.0
Assembly
This sections provides an overview of DHH-10/DHH-10BT assembly.
Place the shipping container in an open area with room for unpacking.
Ensure the shipping container is free of any outside damage. If there is damage, do not open
the shipping container, take pictures of the damage and notify Rice Lake Weighing Systems
and the shipper immediately.
Retain the original shipping materials and container should the product need
to be returned. The product must be properly packed with sufficient packing
materials prior to being moved or shipped.
Damage caused by improper packaging is not covered by the warranty.
2.1 Scale Setup
Use the following sections to set up the scale.
2.1.1 Battery Installation
Requires two AAA batteries (included).
1. Open the battery compartment cover on the back of the scale.
2. Remove the red tab before use.
Figure 2-1. Battery Compartment
3. Install batteries with negative end of batteries against the spring in ± orientation.
Gently tap the top of the scale and then wait for scale to display 0.0 before stepping
onto the scale.
IMPORTANT
Note