OPERATION
TW84 03/07
Operation Section 4-18
© 2007 Alamo Group Inc.
OPERA
T
ION
9. PRE-OPERATION INSPECTION AND SERVICE
Before each use, a pre-operation inspection and service of the implement and tractor must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped
and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection
reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing
parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time
and repair cost can be avoided.
OPS-U-0029
Always disconnect the main PTO Driveline from the Tractor before performing service on
the Implement. Never work on the Implement with the tractor PTO driveline connected and
running. Rotating Parts, Blades or Drivelines could turn without warning and cause immediate entanglement,
injury or death.
(S3PT-11)
Never work under the Implement, the framework, or any lifted
component unless the Implement is securely supported or blocked up
to prevent sudden or inadvertent falling which could cause serious
injury or even death.
(SG-14)
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
Summary of Contents for TW84
Page 7: ...Safety Section 1 1 2007 Alamo Group Inc SAFETY SECTION...
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ...Introduction Section 2 1 2007 Alamo Group Inc INTRODUCTION SECTION...
Page 79: ...Assembly Section 3 1 2007 Alamo Group Inc ASSEMBLY SECTION...
Page 88: ...ASSEMBLY TW84 03 07 Assembly Section 3 10 2007 Alamo Group Inc ASSEMBLY...
Page 92: ......
Page 93: ...Operation Section 4 1 2007 Alamo Group Inc OPERATION SECTION...
Page 137: ...Maintenance Section 5 1 2007 Alamo Group Inc MAINTENANCE SECTION...
Page 145: ......
Page 148: ...TW84 SOM 03 07 P N 00760962C Printed U S A TW84 ROTARY CUTTER...
Page 151: ......
Page 153: ......