MAINTENANCE
TW84 03/07
Maintenance Section 5-2
© 2007 Alamo Group Inc.
MAINTENANCE
Before operating your Rotary Cutter, make sure it is properly lubricated and thoroughly inspected. Only a
minimum of time and effort is required to regularly lubricate and maintain this machine to provide long life and
trouble free operation.
Always disengage the PTO before raising the Rotary Cutter for transporting or making
adjustments.
Lubrication
Do not let excess grease collect on or around parts, particularly when operating in sandy areas. The
illustrations below shows lubrication points. The chart gives the frequency of lubrication in hours, based on
normal operating conditions. Severe or unusual conditions may require more frequent lubrication.
Mnt-R-
0106.
Use an SAE multi-purpose, lithium-type grease for all locations shown. Be sure to clean the fitting thoroughly
before using grease gun. Daily lubrication of the main driveline slip joint is necessary. Failure to maintain
proper lubrication will result in damage to U-joints, gearbox, and/or driveshaft.
Lubrication Fitting Location
ITEM
DESCRIPTION
FREQUENCY
1
U-Joints
8 hours
2
Gearbox
Check Daily
3
Tailwheel Pivot
10 Hours
4
Wheel Hubs
Weekly
5
Telescoping
8 hours
Summary of Contents for TW84
Page 7: ...Safety Section 1 1 2007 Alamo Group Inc SAFETY SECTION...
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ...Introduction Section 2 1 2007 Alamo Group Inc INTRODUCTION SECTION...
Page 79: ...Assembly Section 3 1 2007 Alamo Group Inc ASSEMBLY SECTION...
Page 88: ...ASSEMBLY TW84 03 07 Assembly Section 3 10 2007 Alamo Group Inc ASSEMBLY...
Page 92: ......
Page 93: ...Operation Section 4 1 2007 Alamo Group Inc OPERATION SECTION...
Page 137: ...Maintenance Section 5 1 2007 Alamo Group Inc MAINTENANCE SECTION...
Page 145: ......
Page 148: ...TW84 SOM 03 07 P N 00760962C Printed U S A TW84 ROTARY CUTTER...
Page 151: ......
Page 153: ......