MAINTENANCE
TW144 01/11
Maintenance Section 5-15
©2011 Alamo Group
MAINTENANCE
BLADE TIMING AND ROTATION
(Mnt-R-0102)
Blades on multi-spindle mowers overlap cutting paths to ensure a complete cut across the width of the mower
and to compensate for blade tip wear. If a gearbox has been repaired, a blade carrier or side driveline has been
removed, or other maintenance performed which altered the factory set blade carrier timing, the blades must
be re-timed to ensure they will not collide while rotating.
BLADE TIMING PROCEDURE
1. Raise the mower to minimum height to allow sufficient clearance between the mower deck and ground to
visually inspect blade carriers.
2. Completely shut down the tractor and secure the tractor in position by placing the tractor in park and
setting the parking brake. Securely block the mower at this height.
3. On a side gearbox, remove connecting driveline coupler.
4. Manually rotate carriers until blades are positioned at near 90 degree angle from one another. See Fig.
Mnt-R-0102
5. Replace connecting driveline and coupler.
6. Manually spin carriers a complete rotation to ensure blades do not collide with one another.
Summary of Contents for RHINO TW144
Page 6: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Page 30: ...SAFETY TW144 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Page 31: ...SAFETY TW144 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Page 32: ...SAFETY TW144 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Page 33: ...SAFETY TW144 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Page 34: ...SAFETY TW144 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Page 35: ...SAFETY TW144 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Page 36: ...SAFETY TW144 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Page 37: ...SAFETY TW144 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Page 38: ...SAFETY TW144 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Page 40: ......
Page 41: ......
Page 67: ......
Page 93: ...Introduction Section 2 1 2011 Alamo Group Inc INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 2011 Alamo Group Inc ASSEMBLY SECTION...
Page 111: ...Operation Section 4 1 2011 Alamo Group Inc OPERATION SECTION...
Page 158: ......
Page 159: ...Maintenance Section 5 1 2011 Alamo Group MAINTENANCE SECTION...
Page 162: ...MAINTENANCE TW144 01 11 Maintenance Section 5 4 2011 Alamo Group MAINTENANCE...
Page 163: ...MAINTENANCE TW144 01 11 Maintenance Section 5 5 2011 Alamo Group MAINTENANCE...
Page 176: ...MAINTENANCE TW144 01 11 Maintenance Section 5 18 2011 Alamo Group MAINTENANCE...
Page 190: ...Secci n de Seguridad 1 1 2011 Alamo Group Inc SECCI N DE SEGURIDAD...
Page 191: ......