OPERATION
TW144 01/11
Operation Section 4-21
© 2011 Alamo Group Inc.
OPERA
T
ION
8.2 Mower Pre-Operation Inspection/Service
Before each mower use, a complete inspection and service is required to ensure the mower is in a good and
safe working condition. Damaged and/or broken parts should be repaired and/or replaced immediately. To
ensure the mower is ready for operation, conduct the following.
OPS-R-0007
The operator’s manual and safety signs affixed on
the unit contain important instructions on the safe
and proper use of the equipment. Maintain these
important safety features on the implement in good
condition to ensure the information is available to
the operator at all times.
•
Ensure the manual canister is secured to the
equipment with the operator’s manual inside.
•
Ensure all safety signs are in place and legible.
Replace missing, damaged, and illegible
decals.
OPS-U- 0011
•
Perform scheduled lubrication as detailed in the maintenance section.
•
Ensure all decals are in place and legible.
•
Ensure the driveline is securely attached to
tractor. Make sure the driveline yoke locking
collar is securely seated in the grooves of the
PTO shaft by pushing and pulling the yoke
several times.
•
Lift and Semi-Mount Type-Inspect that the 3-
point hitch pins are the proper size, correctly
installed, and secured to the tractor lift arms
with retaining pins inserted.
•
Pull Type-Inspect that the hitch bolt is the
correct size, that washers are inserted between
the drawbar and hitch clevis, and the locknut is
securely tightened.
OPS-R-0008_F
•
Ensure deflectors and/or chainguards are in
position and not damaged. Replace worn,
broken, and missing pieces.
OPS-R-0038
Summary of Contents for RHINO TW144
Page 6: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Page 30: ...SAFETY TW144 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Page 31: ...SAFETY TW144 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Page 32: ...SAFETY TW144 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Page 33: ...SAFETY TW144 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Page 34: ...SAFETY TW144 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Page 35: ...SAFETY TW144 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Page 36: ...SAFETY TW144 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Page 37: ...SAFETY TW144 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Page 38: ...SAFETY TW144 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Page 40: ......
Page 41: ......
Page 67: ......
Page 93: ...Introduction Section 2 1 2011 Alamo Group Inc INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 2011 Alamo Group Inc ASSEMBLY SECTION...
Page 111: ...Operation Section 4 1 2011 Alamo Group Inc OPERATION SECTION...
Page 158: ......
Page 159: ...Maintenance Section 5 1 2011 Alamo Group MAINTENANCE SECTION...
Page 162: ...MAINTENANCE TW144 01 11 Maintenance Section 5 4 2011 Alamo Group MAINTENANCE...
Page 163: ...MAINTENANCE TW144 01 11 Maintenance Section 5 5 2011 Alamo Group MAINTENANCE...
Page 176: ...MAINTENANCE TW144 01 11 Maintenance Section 5 18 2011 Alamo Group MAINTENANCE...
Page 190: ...Secci n de Seguridad 1 1 2011 Alamo Group Inc SECCI N DE SEGURIDAD...
Page 191: ......