![RHINO RHINO TW144 Operator'S Manual Download Page 129](http://html1.mh-extra.com/html/rhino/rhino-tw144/rhino-tw144_operators-manual_1452623129.webp)
OPERATION
TW144 01/11
Operation Section 4-19
© 2011 Alamo Group Inc.
OPERA
T
ION
8. PRE-OPERATION INSPECTION AND SERVICE
Before each use, a pre-operation inspection and service of the implement and tractor must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped
and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection
reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing
parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time
and repair cost can be avoided.
OPS-U-0029
Always disconnect the main PTO Driveline from the Tractor before performing service on
the Implement. Never work on the Implement with the tractor PTO driveline connected and
running. Rotating Parts, Blades or Drivelines could turn without warning and cause
immediate entanglement, injury or death.
(S3PT-11)
Never work under the Implement, the framework, or any lifted
component unless the Implement is securely supported or blocked up
to prevent sudden or inadvertent falling which could cause serious
injury or even death.
(SG-14)
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
Summary of Contents for RHINO TW144
Page 6: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Page 30: ...SAFETY TW144 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Page 31: ...SAFETY TW144 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Page 32: ...SAFETY TW144 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Page 33: ...SAFETY TW144 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Page 34: ...SAFETY TW144 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Page 35: ...SAFETY TW144 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Page 36: ...SAFETY TW144 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Page 37: ...SAFETY TW144 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Page 38: ...SAFETY TW144 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Page 40: ......
Page 41: ......
Page 67: ......
Page 93: ...Introduction Section 2 1 2011 Alamo Group Inc INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 2011 Alamo Group Inc ASSEMBLY SECTION...
Page 111: ...Operation Section 4 1 2011 Alamo Group Inc OPERATION SECTION...
Page 158: ......
Page 159: ...Maintenance Section 5 1 2011 Alamo Group MAINTENANCE SECTION...
Page 162: ...MAINTENANCE TW144 01 11 Maintenance Section 5 4 2011 Alamo Group MAINTENANCE...
Page 163: ...MAINTENANCE TW144 01 11 Maintenance Section 5 5 2011 Alamo Group MAINTENANCE...
Page 176: ...MAINTENANCE TW144 01 11 Maintenance Section 5 18 2011 Alamo Group MAINTENANCE...
Page 190: ...Secci n de Seguridad 1 1 2011 Alamo Group Inc SECCI N DE SEGURIDAD...
Page 191: ......