Rhino-Rack Nautic Kayak Loader (NKL)
Page 9 of 16
Assembly J
Cut rubber strips as shown. Insert the 4 RMPH units
near the crossbar with the winch. These will be used
to store the ramps when they are not in use.
Run the line from the vertical roller to the
horizontal roller.
Note: If
fi
tting HD
Crossbars,
use the hardware from
NKL-FK1
Note: Operation can be viewed
here - http://youtu.be/FIpxXv9Ah3c