STEP 3: Using basepad as a guide, mark spots on concrete where 4 holes will be
drilled (see Figure 3).
STEP 4: Drill four pilot holes in pad, ensuring that the hole is at least 1/4” deeper
than the concrete screw being used.
STEP 5: Center basepan over pre-drilled holes and insert concrete screws.
STEP 6: Tighten concrete screws.
NOTE:
Do not over-tighten the concrete screws. Doing so can weaken the
integrity of the concrete screw and cause it to break.
STEP 7: Finish unit assembly per unit’s installation instructions.
4.0 REFRIGERANT CONNECTIONS
All units are factory charged with Refrigerant 410A. All models are supplied with
service valves. Keep tube ends sealed until connection is to be made to prevent
system contamination.
4.1 Tools Required For Installing & Servicing R-410A Models
Manifold Sets:
-Up to 800 PSIG High side
-Up to 250 PSIG Low Side
-550 PSIG Low Side Retard
Manifold Hoses:
-Service Pressure Rating of 800 PSIG
Recovery Cylinders:
-400 PSIG Pressure Rating
-Dept. of Transportation 4BA400 or BW400
9
!
CAUTION
R-410A systems operate at higher pressures than R-22 systems. Do not use
R-22 service equipment or components on R-410A equipment.
FIGURE 2
RECOMMENDED ELEVATED INSTALLATION
Summary of Contents for ASL-JEC Series
Page 48: ...48 FIGURE 13 WIRING DIAGRAM FOR ASL 024JEC 036JEC 19 0 WIRING DIAGRAMS...
Page 49: ...49 FIGURE 14 WIRING DIAGRAM FOR ASL 039JEC 048JEC 060JEC DUAL DRIVE...
Page 50: ...50...
Page 51: ...51...
Page 52: ...52 CM 1108...