background image

12.01. weekly 

 

 

 

 

external body  

 

 

 

 

 

 

 

 

cups station 

 

 

 

 

product slides  

  

 

dispensing system  

 

 

 

 

walls and bottom of the 

machine 

 

internal wall of the door 

 

 

 

12.02. monthly 

 

environmental  and 

powder aspirators 

 

 

 

 

products canister 

 

 

 

 

12.03. yearly 

 

dispensing system  

 

 

 

 

products canister 

 

 

 

 

powder aspirator drawer  

 

 

 

boiler 

 

 

 

 

 

 

 

silicone tubes  

 

 

 

 

power  off  the  machine;  detach  the  power  supply  cable  and 

carefully  make  sure  that  there  is  no  sign  of wear; carefully  check 

the stability and efficiency of the internal connections of the mains 

supply; 

 

use  a  non-abrasive  piece  of  cloth  after  having  dampened  it  with 

lukewarm  water;  only  if  necessary,  use  a  neutral,  non-foamy, 

detergent; 

attention 

 

use  neutral  detergent  products  only;  never  use  abrasive  cloths, 

steel sponges, aggressive or foamy detergents and other solvents, 

hot water and acids;  

 

extract  the  drip  tray,  remove  the  upper  grilled  cover  and  wash 

them abundantly with water “A”; clean the seat of the drip tray and 

the  nozzles  holder  spout  “B”;  to  remove  the  clamp  of  the  cup 

station, just press the two side hooks       ; 

  

remove them from the product containers, wash them abundantly 

with lukewarm water (product slides are bayonet-fastened) “C”; 

 

turn the fastening small  levers of the mixing bowls “D” clockwise, 

remove  the  dispensing  nozzles  “B”,  pull  the  mixing  bowl  and  the 

powder  suction  ring;  wash  the  assembly  of  disassembled  parts 

abundantly with lukewarm water;  

 

remove  any  trace  of  residue  from  the  internal  surfaces  of  the 

machine and clean by using a damp piece of cloth; 

 

remove  any  trace  of  residue  from  the  surfaces  inside  the  door, 

above all in the proximity of the cup station; 

 

 

 

 

carefully make sure that the motors of the two aspirators can freely 

rotate and have no obstacles or obstructions; 

make  sure  that  the  corrugated  tube  connecting  the  powder 

aspirator and the aspiration drawer is clean and free of any product 

deposit “G”; 

 

close  the  slides,  remove  the  canisters  from  the  machine,  clean 

them externally; clean the support surface carefully to remove any 

trace of product;  

 

 

 

 

replace  the  gasket  at  the  base  of  the  mixing  bowl  of  the  mixer; 

remove the mixer motor fan by pulling it; replace the gasket of the 

mixer motor shaft “E”; 

 

 

disassemble the products canister from the machine; empty them, 

disassemble  them  in  their  basic  components  and  wash  them 

carefully “F”; 

 

 

disassemble the mixing bowls; pull out the extraction drawers “H”; 

wash them with plenty of lukewarm water; 

 

 

empty  the  boiler  by  means  of  a  drain  pipe;  extract  it  from  the 

machine,  remove  the  cover  and  wash  the  tank  by  removing  any 

solid residue that may have built up at the bottom; 

remove any calcareous deposit from active elements: temperature 

probe,  heating  element,  level  probes,  the  shafts  of  rotary 

pumps, …; 

 

 

make sure that the water transport tubes are intact and that they 

have kept their transparency, replace them, if necessary; 

 

 

 

 

 

 

 

 

 

MAN1890105 rel. 02 dated 08.03.2017     

 

                         page no. 34 of  38 

 

www.rheavendors.com     tel: 0039 02 966 551     fax: 0039 02 96 55 086     e mail: [email protected] 

rheavendors group's sole property 

XX micro  by 

Summary of Contents for XX micro

Page 1: ...XX micro type xx ___________________________________ www rheavendors com INSTALLATION AND MAINTENANCE MANUAL Translation of the original instructions MAN1890105 rel 02 dated 08 03 2017 instant...

Page 2: ...with the utmost caution SERVICE KEY IN USE the symbol recommends the utmost attention during the actions described the use of the service key intended to activate all machine functions when the door i...

Page 3: ...storage and operation temperature 5 C 35 C relative humidity max 80 the inclination of the vending machine support surface shall not exceed 2 if the hydraulic connection tube is not supplied with the...

Page 4: ...collection in order to prevent any potential effect on the environment and human health strictly follow the provisions of the European Parliament s 2012 19 EU Directive MAN1890105 rel 02 dated 08 03 2...

Page 5: ...signs carry it out quickly without leaving the station install the machine in a sheltered illuminated ventilated and noiseless environment keep it clean and never place tools or any other object on i...

Page 6: ...e or carelessness non observance of the instructions for the operation of the machine incorrect installation or maintenance by unauthorised personnel transport damage or any circumstance anyway not du...

Page 7: ...2001 A2 2008 EN 61000 3 2 2014 EN 61000 3 3 2013 EN 301 489 1 V 1 9 2 EN 301 489 7 V 1 3 1 EMF EN 62233 2008 RADIO ETSI EN 301 511 V9 0 2 2003 manufacturer Rhea Vendors Group S p A Via Valleggio 2 bis...

Page 8: ...02 96 55 086 e mail rheavendors rheavendors com ATTENTION this label applied next to the serial number label inside the vending machine points out that the instructions supplied by this manual must b...

Page 9: ...ner of the vending machine it is an integral part of the machine and it shall be kept with it the information supplied by this manual are intended to achieve the best performances of the vending machi...

Page 10: ...ressure level six selection buttons open drip tray beneath the cup surface a fixed dispensing place overflow sensor water inlet solenoid valve with anti flood sensor a main switch a door switch two 6...

Page 11: ...onsumption power vending phase the complete data according to the EVA EMP Energy Measurement Protocol are made available upon request see 02 02 the power supply cable supplied with the vending machine...

Page 12: ...X micro range to complete and supplement the vending machines of the XX micro range Rheavendors Industires S p A has got a series of accessories manufactured for these machines such as cabinets autono...

Page 13: ...17 nozzle support 05 10 water drain plug 05 22 air aspirator 05 21 powder aspirator 05 24 pump motor 05 15 closing baffle 05 16 mixing bowl 05 06 drip tray 05 19 water load solenoid valve 05 12 servic...

Page 14: ...water quantity in the boiler is lower than the required level led off to signal an operation error see page 30 POWER LED TEMPERATURE LED WATER LED OFF ALLARM LED water outlets 05 06 waste water from t...

Page 15: ...it collects possible residual drops from the dispenser and if necessary the waste water in excess from the boiler it is slided at the bottom of the machine case in the front and it is composed by a c...

Page 16: ...ukewarm running water a fixed support on the cup station is intended to accommodate the two dispensers coming from the mixing bowls the motors of mixers help to mix instant products with water by mean...

Page 17: ...e frame by means of four board supports the selection keyboard cable provides for the signal exchange with the keyboard see 05 02 and with the flash key housing see 05 18 arranged inside the door the...

Page 18: ...ied by the operator both manually on the machine and by means of rheAction to adjust the end users needs to the behaviour of the machine product quantities and mixtures warning messages see 09 a syste...

Page 19: ...display press key P to access and quit the programming mode press key T to confirm some values you have entered see e g 09 01 h product de counter product qty MT2 A red 0020040331CL TERMINALE MT2 A p...

Page 20: ...tial source of danger only specialised companies may be charged to provide for the disposal of package components the vending machine shall be arranged for work in a sheltered room by using a support...

Page 21: ...address http eur lex europa eu directive 98 83 EC of 03 11 1998 observe the rules on connections with the electric network in particular on grounding connect the machine permanently without using any...

Page 22: ...e setup value see 09 01 d during this phase the red temperature led turns on and off to signal that the heating element has been powered on and that water is heating in the boiler all green leds turn...

Page 23: ...sanitise is specified by the anti bacterial product package at the end remove all the parts you have sanitised from the solution dry them carefully by using clean cloths and reassemble them into the m...

Page 24: ...ater circuits after having programmed press 1 and then the key P of terminal MT1 or the same key as for terminal MT2 A to go back to the usual operation of the vending machine and to store all changes...

Page 25: ...high by pressing keys 4 and 5 see 13 11 the rotation time of the mixer motor can be changed by pressing keys 4 and 5 if time is equal to zero the mixer will not rotate if the rotation time is other th...

Page 26: ...rd VA 102 quantity of total vends parameter not resettable VA 104 quantity of the vends made after the reset VA 202 quantity of total tests parameter not resettable LA 1 1 selections sold this chapter...

Page 27: ...se this option and press 1 or 2 to enable the vending machine to dispense a pre fixed water quantity to wash the corresponding circuit see 08 03 the values of the variables composing the machine progr...

Page 28: ...n mixer speed n water time n start delay water n out of service year tuning pump N inhibited machine code a access code sales audit clock enable display temp voltage 2 DATA 2 sales audit 3 FREE 3 free...

Page 29: ...lay prod 3 0 water 2 30 delay water 2 10 mixer 2 35 delay mixer 2 12 2 cappuccino prod 2 20 delay prod 2 10 prod 3 19 delay prod 3 70 water 1 50 delay water 1 0 mixer 1 60 delay mixer 1 3 water 2 40 d...

Page 30: ...um high mixer sec 0 20 0 no mixer mixer start delay sec 0 20 0 no delay mixer speed low medium high temperature boiler C 0 95 product decounter sec 0 6 000 0 no limit machine code A and B n 0 65 535 m...

Page 31: ...tities see 05 02 the 24 V dc power supply should exceed the limit value replace the CPU board see 05 25 a after al long inactivity if this error happens could be enough to switch off and switch on the...

Page 32: ...MAN1890105 rel 02 dated 08 03 2017 page no 32 of 38 www rheavendors com tel 0039 02 966 551 fax 0039 02 96 55 086 e mail rheavendors rheavendors com rheavendors group s sole property XX micro by...

Page 33: ...provided it is compatible with human health and the supply of foodstuffs reassemble all the parts you have cleaned after having dried them by means of a clean piece of cloth refer to the content of t...

Page 34: ...l surfaces of the machine and clean by using a damp piece of cloth remove any trace of residue from the surfaces inside the door above all in the proximity of the cup station carefully make sure that...

Page 35: ...thereof after having carried out the operations above disassemble the vending machine by separating every single component and subdividing the parts according to the nature of materials the applied s...

Page 36: ...he power supply wires can be removed without any tool remove the product canister access the rear part of the machine extract the two small electric cables from the motor hold the body push it to the...

Page 37: ...er of instant products from inside the machine it is recommended to use the value in minutes you have already programmed three if you should use particularly volatile products increase the time to fiv...

Page 38: ...mail rheavendors rheavendors com esclusiva propriet di rheavendors group name silicone hose 05 08T silicone hose 06 09T silicone hose 07 11T silicone hose 10 14T symbol T1 T2 T4 T8 column name boiler...

Reviews: