Introduction
CGS-240 Manual
6/15/2021
Page 4 of 148
INTRODUCTION
The RH Systems CGS-240 Humidity Generator is a system capable of continuous, high-accuracy humidity
generation over a wide range of humidity, temperature, and flow rates. The CGS-240 design is an RHS hybrid two-
pressure two-temperature system based on the fundamental two-pressure principle originally developed by NIST.
The basis of this principle and its original development are discussed below.
1.1
BACKGROUND OF HUMIDITY GENERATION
In 1948 at the U.S. National Bureau of Standards (now the National Institute of Standards and Technology), E.R.
Weaver and R. Riley developed a “pressure method” for the generation and control of humidity. Their method,
termed the
two-pressure principle
, was derived from measurements of temperature and pressure rather than
requiring measurements of water vapor.
Using their technique, air or some other gas was saturated with water vapor at high pressure and then expanded
to a lower pressure. When saturation and expansion were performed under constant-temperature conditions, the
resulting relative humidity of the gas was simply the ratio of the lower pressure to the higher pressure (or at least
very nearly).
Their equipment was designed for low rates of gas flow and was used under ambient temperature conditions.
Their saturator was a small cylinder containing water and filled with fragments of pumice or stream-washed gravel
through which the gas could be bubbled under pressure. This device was developed primarily for the calibration of
electrically conductive hygroscopic films used in the measurement of water vapor in gases.
In 1951, also at the National Bureau of Standards, the two-pressure principle was the foundation on which A.
Wexler and R.D. Daniels
developed a new “pressure–humidity apparatus” with higher air
-flow capability. Another
significant improvement was the incorporation of temperature control. Developed primarily for hygrometer
research and calibration, it was capable of producing atmospheres of known relative humidity from 10 %RH to 98
%RH over a fairly wide temperature range
–
40°C to +40 °C.
Wexler also designed and constructed a low-humidity generator based on a method termed the
two-temperature
principle
. With the two-temperature principle, a stream of air or other gas is saturated with water vapor at a given
temperature; then its temperature is raised to a specified higher value.
1.2
SCOPE
The CGS-240 Humidity Generator is a portable, self-contained system which produces stable atmospheres of
known humidity and temperature using the two-temperature, two-pressure saturated vapor stream principle. Its
capability and intended purpose is to provide accurate humidity and temperature for the calibration of humidity
sensors, hygrothermographs, chilled mirror hygrometers, and other environmental measuring devices.
Summary of Contents for CGS-240
Page 1: ...CGS 240 RH Systems LLC 1225 W Houston Ave Gilbert AZ 85233 Manual...
Page 98: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 98 of 148 Figure 8 2...
Page 99: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 99 of 148 Figure 8 3...
Page 100: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 100 of 148 Figure 8 4...
Page 101: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 101 of 148 Figure 8 5 Figure 8 6...
Page 102: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 102 of 148 Figure 8 7 Figure 8 8...
Page 103: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 103 of 148 Figure 8 9...
Page 104: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 104 of 148 Figure 8 10...
Page 105: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 105 of 148 Figure 8 11 Figure 8 12...
Page 106: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 106 of 148 Figure 8 13 Figure 8 14...
Page 107: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 107 of 148 Figure 8 15...
Page 108: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 108 of 148 Figure 8 16...
Page 109: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 109 of 148 Figure 8 17...
Page 110: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 110 of 148 Figure 8 18...
Page 111: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 111 of 148 Figure 8 19...
Page 112: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 112 of 148 Figure 8 20...
Page 113: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 113 of 148 Figure 8 21...
Page 114: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 114 of 148 Figure 8 22...
Page 115: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 115 of 148 Figure 8 23...
Page 117: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 117 of 148 Figure 8 25...
Page 118: ...Illustrated Parts Breakdown CGS 240 Manual 6 15 2021 Page 118 of 148 Figure 8 26...
Page 120: ...Drawings CGS 240 Manual 6 15 2021 Page 120 of 148...
Page 121: ...Drawings CGS 240 Manual 6 15 2021 Page 121 of 148 Figure 9 3 Refrigeration System...
Page 122: ...Drawings CGS 240 Manual 6 15 2021 Page 122 of 148 Figure 9 4 Pneumatic System...
Page 123: ...Drawings CGS 240 Manual 6 15 2021 Page 123 of 148 Figure 9 5 Fluid System...
Page 124: ...Drawings CGS 240 Manual 6 15 2021 Page 124 of 148 Figure 9 6 AC Distribution...
Page 125: ...Drawings CGS 240 Manual 6 15 2021 Page 125 of 148 Figure 9 7 AD0 3 LVL4...
Page 126: ...Drawings CGS 240 Manual 6 15 2021 Page 126 of 148 Figure 9 8 Power Distribution...
Page 127: ...Drawings CGS 240 Manual 6 15 2021 Page 127 of 148 Figure 9 9 RLY 1 14...
Page 128: ...Drawings CGS 240 Manual 6 15 2021 Page 128 of 148 Figure 9 10 PT 12 Temp Board...
Page 129: ...Drawings CGS 240 Manual 6 15 2021 Page 129 of 148 Figure 9 11 UART 0 3...
Page 130: ...Drawings CGS 240 Manual 6 15 2021 Page 130 of 148 Figure 9 12 Access to Presat Drain Fitting...
Page 131: ...Drawings CGS 240 Manual 6 15 2021 Page 131 of 148 Figure 9 13 Access to Sat Drain Fittings...
Page 132: ...Drawings CGS 240 Manual 6 15 2021 Page 132 of 148 Figure 9 14 Temperature Probes...
Page 133: ...Drawings CGS 240 Manual 6 15 2021 Page 133 of 148 Figure 9 15 Pressure Transducers Manifold...