When measurements are given for a board

length or width, it is from the longest side.

measure from here

These instructions will construct a 12'x12' building plus a 4' porch. If you received two
books, use the one with the latest revision date.

The material that is included in our kit is listed on the back two pages. The optional floor

package, if ordered, will be supplied by a local lumber supplier.

Our kit does not include the shingles, the quantity needed is listed on Step 23. The siding
is primed. You will need to apply a finish coat using latex acrylic paint.

Our framing lumber is imported to provide you the highest quality available. However, if
you need to replace any lumber for any reason please do so and we will reimburse you.

Our deluxe kit includes barn doors that have been pre-built. The siding and roof sheathing
has also been cut for EZ assembly.

IMPORTANT: Unpack the material from the pallet, then unscrew the bottom 2x4s from
the pallet runners. The bit for the screws is packed in the hardware bag. Remove the OSB
panel from the sheet goods pallet, it will be used for roof sheathing.

Stacking the boards, according to size, will make them easier to find when needed. Some

boards have colored ends. All the wall studs have black ends, stack these boards together.

Do Not discard any material until your building is complete.

If you have any questions about assembling the kit, call 800-245-1577. If you are calling
after normal business hours, call 724-866-HELP (4357) or email to [email protected].

Before you begin construction, be sure to study this assembly manual. Also, obtain a building

permit and check all pertinent building code regulations.

Thank you for your purchase.

Bill & Linda Rinella, owners

I

MPORTANT

 I

NFORMATION

 A

BOUT

 Y

OUR

 S

HED

 K

IT

Tool List

Hammer & Hand Saw

Framing Square & Level

Power Circular Saw

Power Drill/screwdriver

Measuring Tape

2 - 8' Step Ladders

Always wear safety glasses when cutting or nailing!

Summary of Contents for the Fairview

Page 1: ... 205 Arlington Drive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2012 the Fairview Assembly Book Revised April 28 2015 ...

Page 2: ...MPORTANT Unpack the material from the pallet then unscrew the bottom 2x4s from the pallet runners The bit for the screws is packed in the hardware bag Remove the OSB panel from the sheet goods pallet it will be used for roof sheathing Stacking the boards according to size will make them easier to find when needed Some boards have colored ends All the wall studs have black ends stack these boards t...

Page 3: ... center spacing X marks where floor joist will be placed It is important that the floor be level and square Before nailing the flooring measure the floor diagonally corner to corner Then measure the opposite corners These measurements will be the same if the floor is square Material Description 12 x 12 shed 2x4 Joist Headers 2 pcs 12 2x4 Floor Joist 10 pcs 12 2x6 Porch Flooring 9 pcs 12 4x4 Treate...

Page 4: ...er with a wood gusset Apply wood glue between the 2x4 boards and the gusset Nail the gusset to the 2x4s with 6d common nails Use 14 nails per gusset 4 Install a 2x4 90 collar tie between the 2x4 boards Hold in place with 2x4 blocks Install 12 x24 gussets to the ends of the collar tie Glue and nail using 14 nails per gusset 5 Turn this truss over and apply wood gussets to the opposite side 6 Repeat...

Page 5: ...late 2 Place 2 two truss members in the jig Secure the top together with a barbed metal plate 3 Remove the 2x4 blocks at the corners of the floor and insert the gable plate assembled above into the bird s mouth Make sure the 2x4 gable plate is straight If necessary tack 2x4 blocks to hold plate straight 4 Remove the two 2x4 blocks that held the collar tie in position 5 Install 2x4x23 1 2 gable stu...

Page 6: ...e as either the LAP Edge or the Tongue Edge Nail siding with 8d galv nails spaced 12 apart Exterior Siding Step 3 Install Siding on Gables 1 Select one of the gable frames Turn the gable over letting the bottom plate overhang the floor so the gable lays flat 2 Install gable siding using 6d galv nails LAP Edge LAP Edge Install Siding on Ends Siding Extends 3 4 Below Bottom Plate 3 Install siding on...

Page 7: ...uds will be located Mark the ends that will butt together with the letters A and B A B 3 Square wall frame Measure diagonally corner to corner The measurements will be the same when the wall is square 4 Install the 1st siding panel with the LAP edge extending 3 1 2 past the wall frame The bottom will extend 3 4 below the bottom plate Tip Use 3 4 trim board as a gauge 5 Install the other siding pan...

Page 8: ...wall studs will be located 72 Wall Plate 24 23 1 4 24 23 1 4 72 Wall Plate 72 Bottom Plate 2 Install 72 wall studs between the top and bottom plates Nail both wall frames together LAP Step 5 Assemble 12 Back Wall 3 Square wall frame 4 Install the first siding panel with the LAP edge flush the end of the wall and extending 3 4 below the bottom plate 5 Install 2 two more siding panels ...

Page 9: ...nel with the tongue edge Install this panel with the cut edge extending 3 1 2 beyond the end of the frame The siding should extend 3 4 below the bottom plate 71 1 2 Header Support Tongue Edge 7 Install the remaining siding on the other front wall frame Cut the 24 wide siding panel to extend 3 1 2 past the end of the wall fame 4 Locate a 16 wide siding panel that has a LAP edge Position this panel ...

Page 10: ...ng panel last 6 Locate a 7 1 2 wide siding panel that has a LAP edge The siding is packed in the door carton Position this panel with the cut edge flush with the 2x4 header support and extending 3 4 below the bottom plate Do not nail along the LAP edge until the other siding panel is installed 54 1 4 Wall Plate 4 Cut 2 2x4 6 boads to a length of 54 1 4 5 Repeat steps to assemble another wall frame...

Page 11: ...4 6 boards at both sides of the door openings to hold the walls straight 2x4 Door Header Sidewall Panels Without Door Opening 1 Nail 2 two 35 1 2 long 2x4 together with a OSB filler panel between them Use 10d sinkers 35 1 2 Long 2x4 OSB Filler 67 1 2 Door Header 5 Install the door header assemble above between the front wall panels Nail through the wall stud into the ends of the header Toenail int...

Page 12: ...ced 12 apart 2 Cut 1x4 6 trim boards and install between the corner trim boards Install Trim Flush with Top Plate Back Wall Panel Step 10 Assemble Porch Material 1 Butt 2 two 70 1 2 long 2x4s with OSB fillers attached to one side together 2 Install a 47 long 2x4 between the top 2x4 boards Apply glue and nail with 10d sinkers 70 1 2 2x4 with OSB 47 Long 2x4 3 Install a pre cut 2x6 treated board to ...

Page 13: ...Install beam flush with top of 2x4 wall plate Hold in place with a 2 1 2 wood screw 4 Screw post to floor with 2 1 2 screws Make sure post is plumb before nailing 5 Install a post and beam on the opposite corner Step 11 Install Porch Posts Beams 2x4 68 1 2 Tie plate 6 Set front beam on the corner posts Toenail beam to corner posts with 8d galv nails 7 Install 68 1 2 long 2x4 over the sidewalls and...

Page 14: ...three 41 long 2x3s inside 2 two 68 1 2 long 2x3 boards Use 10d sinkers Step 12 Install Porch Ceiling 5 Install the two porch panels built above flush with the top of the 2x4 tie plates Secure with 10d sinkers 6 Install 2 1x6 72 white pine boards over the front beam flush with the top of the beam Secure with 8d galv nails 7 Install a 3 1 2 x 48 siding panel over the side beams 3 1 2 x 48 Siding Cei...

Page 15: ... with 8d galv nails Porch Railing Step 14 Install Rear Gable Important Bottom edge of siding extends over 1x4 trim Paint this edge Step 13 Install Porch Railing 2x4 43 3 8 Top Railing 1 Install using 2 1 2 screws 43 3 8 porch railing between the corner posts and 1x4 trim 2 Install center posts and porch railing Toenail post to beam with 8d galv nails 3 Install 43 3 8 long 2x4s over the railing sec...

Page 16: ...ter when you install the doors Use 8d galv nails 5 Install a 1x3x71 3 4 board that has angle cuts on both ends across the top of the side trim 1x3 72 Door Trim 1 Install a 2x4 6 boards as a tie plate across the sidewall with the double doors Use 10d sinkers 2 Cut a 6 long 2x4 to finish 3 Install tie plates on the opposite sidewall 2x4 6 Tie Plate Step 15 Install 2x4 Tie Plates ...

Page 17: ...X mark on the same side of the line so your trusses are parallel when they are installed 2 Starting at the rear of the building install 5 five metal hangers to the tie plate with 1 1 2 hanger nails The opening should line up with the X mark the bottom of the opening flush with the 2x4 tie plate Detail D 3 Install 5 five metal hangers on the opposite sidewall 24 21 3 8 Detail D Measure From Backsid...

Page 18: ...e 5 five trusses to metal hangers with 1 1 2 hanger nails 2 Secure 2 two trusses over the porch by toe nailing them to the wall plate and side beam with 10d sinkers 3 Install the front gable The siding should extend over the 1x6 white pine trim ...

Page 19: ...he top of the door trim 3 Lay the door with the trim facing up 4 Install 5 hinges to one side of the door frame To position the hinge properly hold the rectangular plate against the frame Use 1 3 4 black screws 5 Position door in opening Install hinges to trim with 1 3 4 black hinge screws 6 Install door latch 1 Locate a 5 wide x 24 siding panel that has a tongue edge Install this panel under the ...

Page 20: ...cia boards flush with the face of the siding on the back gable Install the fascia so the bottom edge of the roof sheathing will rest on the 1x6 See detail below Use 8d galv nails Make sure the trusses are plumb and the roof sheathing meets the center of the truss Use 7d sinkers spaced 12 apart The upper roof sheathing will be about 1 below the ridge to allow for ventilation 48 x 72 OSB Sheet 37 1 ...

Page 21: ...nstall roof sheathing at the front of the building Make sure the gable is plumb cut the roof sheathing flush with the siding on the gable 2 Install a 1x6 4 fascia board 3 Cut and install 1x6 7 fascia board flush with the siding on the gable Remove From Pallet 37 1 2 x 72 Step 20 Install Roof Sheathing Continued 48 x 48 37 1 2 x 48 Cut to Length Cut to Length Cut 1x6 7 Fascia 1x6 4 Fascia ...

Page 22: ...m in or out to make the door spacing equal 5 Install hinges to trim with 2 screws OSB Shim 1 Lay the left door with the trim facing up The siding on the left door extends past the door trim See detail below 2 Install 5 hinges to the left side of the door frame To position the hinge properly hold the rectangular plate against the frame Use 1 3 4 black screws 3 Install hinges to the right side of th...

Page 23: ... x 75 1 4 1 ea Siding Panel 3 3 4 x 32 1 2 3 ea Door Hinges 1 Door Latch 1 ea Pre built Door 32 x 71 3 4 3 ea 2x4 Wall Studs 72 2 ea 2x4 Door Jacks 71 1 2 2 ea 2x4 Door Header 35 1 2 1 ea 7 16 OSB Filler 35 1 2 2 ea 1x3 Door Trim 72 2 Install shingles according to the instructions on the wrapper If you need more detailed instructions on installing shingles there are good publications at book store...

Page 24: ...8 Wall Studs 2x4 72 2 Door Jacks 2x4 71 1 2 4 Wall Plates 2x4 68 1 2 2 Wall Plates 2x4 58 1 2 2 Wall Plates 2x4 34 3 4 4 Gable Studs 2x4 23 1 2 10 Truss Gussets 7 16 8 x 20 20 Truss Gussets 7 16 12 x 24 2 Soffit Boards 3 8 5 x 24 6 Soffit Boards 3 8 5 x 48 2 Siding Panels 16 x 75 1 4 4 Gable Trim 1x6 87 8 Corner Trim 1x4 75 3 4 4 Wall Trim 1x4 72 2 Door Trim sides 1x3 72 1 Door Trim top 1x3 71 3 4...

Reviews: