background image

 

 

 
 

II&E2020_11 

   Hi-Finity electric lock: Installation and testing 

– Manual for the installer & electrician      11

 

 
 

3.1.2  Electric lock upgrade ready 

!

 

The top profile millings (see catalogue) are >1meter from the edge of the Hi-Finity 
moving glass pane. 

 

1

  Check the millings 

 

Milling for lock 

 

Milling for slide motor  

 

Milling for return pulley 

 

Position of all millings as if for 
motorised 

Make all electrical connections 

 

Insert the R-Switch box 

 

061.8478.--

 

 

The cables ((Power-, pushbutton- and alarmfeedback cable) or 6-wire cable) enter the 
profile at the position of the motor 

 

Use the extension cable for the powercable 

062.8681.--

 and one for the pushbutton 

062.8682.--

 to extend to the position of the lock 

 

The lock cable(no functionality during preparation period) and alarm feedback extension 
cable are already installed. 

 

Positioning from the position of the motor to the position of the lock, through the correct 
chamber of the profile 

 

Connect all wires to the R-Switch box  

 

062.8681.--

 + 

062.8682.--

 are the only cables that can be placed in the cavity 

where the future belt will be placed 

3

  Install the lock and lock bracket 

4

  Install finishing caps for motor and return  millings need to be made already!! 

 
 

 

Summary of Contents for 062.8262.

Page 1: ...Version 3 12 2020 Electric lock 062 8262 Installation and testing Manual for the installer electrician Manually slide and electric lock Preparations for potential conversion to motorized sliding...

Page 2: ...connections 13 3 2 1 Power connection 13 3 2 2 Using Motor cable 13 3 2 3 Pre wired Electric Cabinet 13 3 3 Onsite completion mechanical installation 14 3 3 1 Assembly of the connection rod 14 3 3 2...

Page 3: ...uit breaker before making any connections Disconnect the batteries in the cabinet before making adjustments to the DC voltage If you have any doubts about the operation or execution please contact you...

Page 4: ...rk needs to be done for the upgrade to a motorised solution Guidelines and decision matrices to help you select the right articles quantities and millings can be found in the above mentioned catalogue...

Page 5: ...2 8246 OR DIN RAIL POWER SUPPLY 24VDC 0 75AMPS 062 8623 OR BUILD IN POWER SUPPLY 24VDC 0 75AMPS 062 8624 OR DIN RAIL POWER SUPPLY 24VDC 1 75AMPS 062 8647 OR DIN RAIL POWER SUPPLY 24VDC 4 2AMPS 062 859...

Page 6: ...PPLY CABLE 10M POWER ALARM BUTTON 3 in 1 062 8584 Only to be used if 062 8217 and 062 8219 or 062 8222 or 062 8547 is not been selected CABLE 10M FOR PUSH BUTTON Installer sources push button 062 8219...

Page 7: ...nnecting rod 062 9551 POWER EXTENSION CABLE 5M 062 8681 PUSH BUTTON EXTENSION CABLE 5M 062 8682 LOCK CABLE FOR SLIDING WINDOW MOTOR 5M Needs to be pre installed not possible afterwards 062 8546 EXTENS...

Page 8: ...arts for conversion to a motorised element R ADAPTER LOCK INPUT SLIDE MOTOR ELECTRIC LOCK 062 8296 Replaces 061 8478 SLIDING WINDOW MOTOR 50W 062 8252 SLIDING WINDOW MOTOR DOCKING UNIT 062 8254 Replac...

Page 9: ...motorised element Electric lock upgrade to motorization 2 Onsite electric connections Integrated power supply Electric cabinet power supply E Cabinet 3 Onsite completion mechanical installation Connec...

Page 10: ...ation and testing Manual for the installer electrician 10 FIG R SWITCH BOX 061 8478 3 Install the lock and lock bracket 4 Protect the wires electronics and electric devices for transport preventing da...

Page 11: ...or 6 wire cable enter the profile at the position of the motor Use the extension cable for the powercable 062 8681 and one for the pushbutton 062 8682 to extend to the position of the lock The lock ca...

Page 12: ...dy parts and collision For safety reasons only Reynaers Aluminium catalogue articles can be used to complete the system The checklists for compliancy must be filled in and kept by the fabricator in th...

Page 13: ...diagram 401 in ANNEX DIN rail PSU 24VDC and In 0 75Amp 062 8623 Optional DIN rail battery backup UPS 062 8597 Option 2 build in behind wall switch profile see wiring diagram 402 in ANNEX Alternative P...

Page 14: ...1 Remove the stopper and slide the glass pane completely to open position 2 Slide the rod into the top U profile hooked into the drop bolt 3 Move the glass pane until fully closed position 4 Insert t...

Page 15: ...lock but is not yet locked because the magnet is not yet into place the LED will blink When it is required to lock each time the vent is back in closed position follow the next procedure Take out the...

Page 16: ...t Further information on the guarantee can be found in the Reynaers guarantee 20xx document available on the Reynaers website 5 DISMANTLING AND REMOVAL Discarded materials are not worthless rubbish Va...

Page 17: ...to the lock o Check wiring diagrams and wire colors o Try different button on R Switch box The lock is not locking o Check behaviour of the LED o Open the window and try holding a loose magnet to the...

Page 18: ...II E2020_11 Hi Finity electric lock Installation and testing Manual for the installer electrician 18 7 Technical specifications 7 1 Electric drawings...

Page 19: ...II E2020_11 Hi Finity electric lock Installation and testing Manual for the installer electrician 19...

Page 20: ...II E2020_11 Hi Finity electric lock Installation and testing Manual for the installer electrician 20...

Page 21: ...in1 and Pin3 are connected and this will give a normal closed circuit when the lock is closed and the window is closed this means the pen of the dropbolt lock is down and the magnet is in the right po...

Page 22: ...IP20 Dimensions Body 200 L x 32 W x 46 D mm Dimensions Bolt 17 Throw x 15 5 Diameter mm Shear force 1000kg Operating temperature 0 90 Humidity 85 Rh max R Switch box 062 8344 Model R Switch Input 24VD...

Page 23: ...Finity electric lock Installation and testing Manual for the installer electrician 23 REYNAERS ALUMINIUM NV SA Oude Liersebaan 266 B 2570 Duffel t 32 15 30 85 00 f 32 15 30 86 00 www reynaers com inf...

Reviews: