English
It
aliano
13
3. ASSEMBLY
3.1. PREPARATIONS IN WORKSHOP
•
Step 1: Cut profiles to length
•
Step 2: Mill profiles
Reference line for the milling is the middle line of the meeting section. For
further detail, please refer to the catalogues and ReynaPro.
HFP 147
089.D25-.--
HFP 179
089.E25-.--
•
Step 3: Clean out profiles after milling - inside as well!
Debris and coolant in the profile can get caught up in the timing belt, causing
slippage over the pulley or jamming of the gears.
So make sure profiles are
clean.
Recommendation: use a Cleaning mousse (062.9426.04) and push it through
the chamber to clean it out.
Deburr all milled edges with a correct deburring tool.
•
Step 4: Place profile with milling upwards on a working table
•
Step 5: Place cables in the profile
(in total at least 3 cables should be
installed)
a.
Lock Cable (062.8546.--) (5 m)
The lock cable interconnects the motor with the electrical lock. The
connector for this cable has a default grey colour. This cable has a
standard length of 5m and can easily be extended.
Vent stroke
Number of cables
< 7 m
1
7 - 12 m
2
Use cable tie holders (screwed or glued version) to hold the cable. These
should be placed in the insulation strip and under the rubber block
(062.8081.--) at the meeting section.
Summary of Contents for 062.8251
Page 28: ...28 ITALIANO ...