
3
IMPORTANT UNPACKING
INSTRUCTIONS
To avoid damage to the power
base, always open the carton
while the power base is laying in
the FLAT position on the floor.
OPEN FLAT
STEP 9
STEP 3
STEP 6
STEP 5
NOTE: An electrical surge
protection unit is recommended
(not included)
WARNING: POWER CORDS
MUST NOT INTERFERE
WITH ANY POWER BASE
MECHANISMS.
WARNING: PINCH POINT! DO
NOT HOLD THE METAL FRAME
FROM UNDERNEATH WHEN
PUTTING ON A FLAT SURFACE
WITHOUT LEGS - INSTEAD, USE
THE HANDLES.
STEP 2
(optional)
STEP 7
Assemble the power base legs.
Screw them in a clockwise direction
into the threaded holes in the frame.
Carefully use the handles on both
sides to lift and place the base on
the floor, platform bed, or in the bed
frame.
STEP 4
ATTENTION!
Improper handling
DO NOT
lean the power
base against the
installed legs to
flip it over.
Carefully flip the base with 2 people
using the handles provided on each
side of the power base.
Plug the power cord into a grounded
electrical outlet.
Package contents:
Remote Control
Retainer Bar(s) (Optional Hardware)
Base Legs (optional)
WARNING: Remove the yellow
packaging bands from under the
frame before attempting to operate
the bed.
STEP 1
STEP 8A
STEP 8B
If you have a retainer bar that
requires hardware, use the retainer
bolts and retainer bar plates to
fasten the Retainer Bar to the power
base.
If you have a tool-free retainer bar,
Insert it into the two mount holes
located at the foot end of the power
base.
Frame Assembly Instructions
NOTE: Be sure to use a
protective layer under the power
base to prevent damage to your
hard floors.
Carefully lift the power base unit
out of the shipping carton, keeping
the unit top side down. For safety
reasons, this should be performed
by 2 people. Be sure to lift the base
by the steel frame, securing the
head and foot sections of the base
so they do not move. Remove all
accessory components from the
undercarriage of the base.
Remove the zip ties securing the
excess cord from the motors of the
power base.
NOTE: Use only a manual
screwdriver to install the retainer
bolts. DO NOT use a power
screwdriver to tighten the bolts.
Power base assembly is now
complete.
Remove the plastic packaging from
the power base. If there is a yellow
packaging band attached to the frame,
remove this as well.