First Commissioning
20
5
First Commissioning
WARNING
W4.0002
Danger to life through electric shock
Damaged power cable
−
Operating the device with a damaged power cable or plug can lead to life-
threatening injuries caused by an electric shock.
•
Before operating the device, check the power cable and plug for
damage.
•
Never operate the device with damaged power cable or plug!
NOTICE
N11.0002
Setting up the device
Disconnecting the device from the mains
−
A separation of the device from the mains must be possible at any time.
•
Set up the device in such a way, that the connection for the power
cable is always easily accessible.
NOTICE
N12.0024
Location requirements
The movement of the sample material causes severe unbalance during
operation
−
Due to the movement of the sample material, the AS 400 control causes
very strong unbalance during operation.
•
The installation must be carried out on a stable, anti-slip, vibration-
free base, which is suitable for both, the weight of the device and the
resulting unbalance during operation.
•
At speeds > 200 U/min, when using test sieves with a diameter of
400 mm and/or with high sieve stacks, the device must be firmly
bolted to the base by means of the transport plates!
•
In order to always ensure safe operation, it is recommended to firmly
screw the AS 400 control to the base regardless of the speed, the
test sieves used and the payload.
Before first commissioning the device must be aligned and the sieve clamping unit must be
installed.
Alignment of the device: