First Commissioning
24
5.2 Lubricating the device when putting it into service for the first time
Fig. 5:
Putting into service for the first time
:
Lubrication points
NOTICE
The ABP 250 must be lubricated after
eight operating hours
when put into service for
the first time . Use the supplied grease press that is filled with Shell Gadus S2 V220 2 for
lubrication.
The following quantities of grease are required for the three lubrication points (
W1, W2, W3
) on
the device:
Lubrication
point
Quantity
(grams)
Operating state
W1
2 x 7
Idling
W2
7
Standstill
W3
7
Standstill
Lubricating the lubrication point (W1) on the side of the device
Switch the ABP 250 on (idling).
Using the grease press, press the right amount of grease into the lubrication point (
W1
).
Switch the ABP 250 off.
Lubricating the lubrication points (W2, W3) under the cover
Switch the ABP 250 off.
Disconnect the ABP 250 from the power supply and secure to prevent it restarting.
Remove the feed hopper.
Unscrew the four M10x25 hex screws (
VS
) on the cover (
V
) at the back of the device
Remove the cover (
V
) from the device.
Place the grease press on the lubrication points in turn (
W2, W3
) and press the right amount
of grease into the respective lubrication point.
Place the cover (
V
) back onto the device.
Secure the cover (
V
) using the four M10x25 hex screws (
VS
).
Assemble the feed hopper on the device.
VS
V
W1
W2
W3
Summary of Contents for ABP 250
Page 2: ...2 Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany...
Page 5: ...Notes on the Manual 5...
Page 16: ...Technical Data 16 3 13 Installation drawing...
Page 55: ...55...
Page 56: ...56...
Page 57: ...Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany...