Step-by-step installation:

ATTENTION!

Damage through overheating!
Commissioning the power stage in a system electrically con-
nected, but not hydraulically filled can lead to damage caused by 
overheating!

 

Î

Make sure the hydraulic system is filled and ready for 
operation.

 

Î

Make sure the store is filled and ready for operation.

 

Î

Mount  the  measuring  unit  on  a  DIN  rail  in  the  domestic  distribution  board 
as close as possible to the energy meter. Make sure that no load is installed 
between the measuring unit and the energy meter.

 

Î

Connect the current sensors and the conductors of the measuring unit in 
phase directly in front of the energy meter (see page 10).

 

Î

Connect the measuring unit with the 

DeltaTherm

®

 PV by means of the 

VBus

®

 (see page 8 and page 11).

 

Î

Establish the power supply of the controller (see page 11).

 

Î

Run the commissioning menu (see page 16).

 

Î

Carry out the desired adjustment in the controller menu (see page 20).

3.2 

Electrical connection

WARNING!

Electric shock!
Upon opening the housing, live parts are exposed!

 

Î

Always disconnect the device from power supply 
before opening the housing!

ATTENTION!

ESD damage!
Electrostatic discharge can lead to damage to electronic compo-
nents!

 

Î

Take care to discharge properly before touching the 
inside of the device! To do so, touch a grounded surface 
such as a radiator or tap!

Note
Connecting the devices to the power supply must always be the last step 
of the installation!

Do not use the devices if they are visibly damaged!
The controller is supplied with power via a mains cable. The power supply of the device 
must be 100 … 240 V~ (50 … 60 Hz). The cross section of the cable must be 2.5 mm². 

Note
Connect the immersion heater with a shielded cable with a cross sec-
tion of 3 x 2,5 mm² (see page 11). 
The cable length must not exceed 5 m.

Power 
supply

 N L   

         

 N L

Electric 
immersion 
heater

Controller with power unit

Measuring unit

VBus

®

Summary of Contents for DeltaTherm PV

Page 1: ...tion Operation Functions and options Troubleshooting DeltaTherm PV www resol com Thank you for buying this RESOL product Please read this manual carefully to get the best performance from this unit Pl...

Page 2: ...impair the function of the device Make sure the device as well as the system are not exposed to strong electromagnetic fields Subject to technical change Errors excepted Target group These instruction...

Page 3: ...t of the controller 12 4 Operation and function of the controller 13 4 1 Buttons 13 4 1 1 Operating control LED 13 4 1 2 Selecting menu points and adjusting values 13 4 2 Commissioning 16 4 3 Menu str...

Page 4: ...roller and power controller internal backup heating Housing sheet metal powder coated Mounting wall mounting Indication Display full graphic display Operation 3 buttons Protection type IP 20 EN 60529...

Page 5: ...rated is high enough the excess current can be used for electri cally heating the water in the store Optional function internal backup heating with booster If the store maximum temperature is reached...

Page 6: ...be supplied from a double pole switch with contact gap of at least 3 mm Please pay attention to separate routing of sensor cables and mains cables In order to mount the device to the wall carry out th...

Page 7: ...7 en 3 2 4 1 5 6 105mm 3 3 2 4 1 5 6 105mm 3...

Page 8: ...menu see page 16 Carry out the desired adjustment in the controller menu see page 20 3 2 Electrical connection WARNING Electric shock Upon opening the housing live parts are exposed Always disconnect...

Page 9: ...terminals marked VBus any polarity The bus cable can be extended by means of a 2 wire cable bell wire The cable carries extra low voltage and must not run together in a cable conduit with cables carr...

Page 10: ...K L K red red red black Energy meter black black Note The 3 phases have to be protected by means of a three phase 16 A circuit breaker not included with the device Single phase connection Connect the...

Page 11: ...N Protective earth conductor Protective earth conductor and shield 0 10V switching input Terminals external power control 17 19 Temperature sensors Terminals S1 temperatur store above the electric imm...

Page 12: ...connect the shield to the electric immersion heater L N 3 3 MicroSD slot of the controller The controller is equipped with a MicroSD card slot With a MicroSD card the following functions can be carrie...

Page 13: ...hes to the Status menu In order to scroll through a menu or to adjust a value press buttons and To open a submenu or to confirm a value press the centre button OK To enter the previous menu scroll upw...

Page 14: ...ination for the following steps The last menu item after the list of days is Continue If Continue is selected the timer menu opens in which the time frames can be adjusted Adding a time frame In order...

Page 15: ...are to be copied All time frames adjusted for the selected day or combination will be copied If the time frames copied are not changed the day or combination will be added to the combination from whic...

Page 16: ...filled and ready for operation connect the controller to the mains The controller has to be connected to the measuring unit by means of theVBus The controller runs an initialisation phase in which th...

Page 17: ...eting the commissioning menu Lastly a security enquiry will appear If the security en quiry is confirmed the adjustments will be saved In order to confirm the security enquiry press the centre button...

Page 18: ...and adjustment values selectable are variable depending on ad justments already made 4 4 Main menu In this menu different menu areas can be selected The following menus are available Status Controlle...

Page 19: ...Heating h Operating hours of the electric heater Backup heat Wh kWh MWh Backup heating energy in Wh kWh MWh Backup heat h Operating hours of the internal backup heating When a line with a measurement...

Page 20: ...point in time This will reduce power peaks at noon 4 7 Measuring unit In the Measuring unit menu the curve of power control can be adjusted The source of the immersion heater power control has alread...

Page 21: ...function again With the menu item Function an optional function already saved can be temporarily deactivated or re activated respectively In this case all adjustments remain stored the allocated rela...

Page 22: ...of the date 01 01 2001 31 12 2099 01 01 2017 Time Adjustment of the current time 00 00 23 59 Factory setting back to factory setting Yes No No 4 10 MicroSD card SD card Adjustment channel Description...

Page 23: ...No Note The controller will only recognise a firmware update file if it is stored in a folder named PVE on the first level of the MicroSD card Create a folder named PVE on the SD card and extract the...

Page 24: ...power unit The following options are available Auto Stage is in automatic mode 0 Stage is switched off 100 Stage is switched on at 100 The power of the modulating stage can be set to the manual mode i...

Page 25: ...ing a screw driver and pull it from the base To replace the fuse F16A pull the fuse holder from the base The operating control LED flashes red and an error is indicated in the status menu Sensor fault...

Page 26: ...red indicated in the status menu A temperature threshold has been exceeded in the controller cooling ele ment As soon as the device has cooled down it will heat with the heating power available A temp...

Page 27: ...ol LED 13 T Technical data 4 U User code 24 6 Accessories Electric immersion heater For installation into the store DL3 Datalogger For visualisation viaVBus net incl SD card mains adapter network andV...

Page 28: ...ct incomplete or false information and or the resulting damages Note The design and the specifications can be changed without notice The illustrations may differ from the original product Imprint This...