46
Commissioning
Filling the heating system
When all boilers have been electrically
commissioned as described above,
then the heating system can be filled.
Each boiler is fitted with a filling and
drain valve. The filling hose from the
water tap is then connected to it.
Venting program
When, on filling the system, the water
pressure rises above 0.7 bar, the
venting program will start automatically.
The program lasts approx. 13 minutes
and in doing so, turns the pump on
and off and, if fitted, the three-way
valve every 80 seconds to remove the
remaining air from the boiler. All venting
points still have to be vented when
filling the installation. The boiler will be
on standby after the venting program.
The automatic venting program only
vents the boiler and not the rest of
the installation.
Read-out 1 (Good status) displays
Block. with actual day and time on the
screen.
Read-out 2 (operational status)
displays Vent Prog on the screen.
[From Good press the – button 1x:
Vent Prog is now displayed]
Water pressure
Screen display
Good
Read-out
Operation
status
Technical
read-out
Description
Action
FILL
dd 00:00
FILL
Bx12sc03
xx.x°C
P0,0
Water pressure is 0 bar,
boiler off
Top up water
FILL
dd 00:00
FILL
Bx12sc03
xx.x°C
P>0,7
Water pressure above
0.7 bar. The boiler is off.
The automatic venting
program starts
Top up water until
approx. 1,7 bar
Block.
dd 00:00
Vent
Prog.
xx.x°C
P>1,2
Automatic venting
program, afterwards
(approx. 13 min.) boiler is
on standby
Top up water until
approx. 1,7 bar
Good
dd 00:00
(variable)
xx.x°C
P>1,0 <4,0
Water pressure is good.
Boiler standby or in
normal operation
None
Block.
dd 00:00
xx.x°C
P>4,0
Water pressure too high,
boiler off due to blocking
Drain water until
approx. 1,7 bar
Good
dd 00:00
(variable)
xx.x°C
P<3,7
Water pressure is good.
Boiler operates normally
again
None
Message/
Block.
dd 00:00
FILL
Message
Mx24sc14
xx.x°C
P<1 >0,7
Water pressure too low.
Boiler is limited to 50%
load
Top up water until
approx. 1,7 bar
OK
-
+
OK
-
+
FILL
Vent
Prog.
Block.
we 10:17
Fill the heating system only
with drinking water. Refer to the
Water Quality chapter for quality
requirements of the filling water.
Interrupting the venting program (not
recommended) is only possible from
the setting level by pressing OK during
the venting program.
For boiler checks please refer to the
chapter Checks prior to commissioning.
For any checks or setting changes,
refer to the Basic Settings chapter.