4) Screw waterproof coupling and Screw cap nut tightly onto the cable.

1) Before connecting PV string, make sure DC switch is turned off.
2) Make sure PV string polarity confirms with DC connector, otherwise, it will cause damage to 

     inverter.

3) Make sure the maximum open circuit voltage (Voc) of each PV string does not exceed the 

     

inverter input voltage Vmax under any condition.

4) Do not connect positive or negative pole of PV string to earth wire. Otherwise, it will cause 

     

damage to inverter.

3.5.2  Connection to PV string (DC input)

3)  Pass the crimped AC wire into the AC connector.

Disassembly the inverter from the Grid:

5)  The cables are inserted into the terminal accord

-

ing to the wire sequence (L1/L2/L3/N/PE), so that 

the insulating terminal is flush with the surface of the 

terminal, and the crimping screw torque is 

2.0±0.1N•m.

6)  Insert the main part of AC connector into the 

terminal and hear a "click" sound.

1)  Use a screwdriver to press against the unlocked 

position and hold the wire nut and pull it back to 

complete the separation of the male and female 

ends.

2)  The female end connector is separated from the 

inverter end connector.

7)  Use a wrench to tighten the nut, and there is a 

"click" sound.

8)  Insert the female end of the wire into the male end 

of the inverter and hear a "click".

9)  Complete the installation.

3)  Hold the unlocking buckle with one hand and 

rotate it in the direction of the mark, and turn the nut 

in the opposite direction.

4)  Use a screwdriver to peel off the positions (both 

sides) indicated by the red circle to complete the 

disassembly.

Summary of Contents for R3 Micro Series

Page 1: ...R3 4K DT R3 5K DT R3 6K DT R3 8K DT R3 10K DT R3 12K DT R3 15K DT UserManual Series R3 Note...

Page 2: ...ackageinformation 8 3 2Installationenvironment 8 3 3Installationposition 9 3 4Mountingprocedure 10 3 5Electricalconnection 11 3 6StartingtheInverter 15 4 UserInterface 15 4 1Ledandkey 15 4 2LCDdisplay...

Page 3: ...red that the open circuit voltage of the PV string never exceeds the maximum permissible input voltage of 1000V DC The PV string open circuit voltage during parallel string operation is 950V Higher vo...

Page 4: ...mainly on internal and ambient temperatures The limitation is calculated continuously and always allows the maximum possible amount of energy to be produced Please use the tool supplied by Renac Power...

Page 5: ...id meet Grid standards BDEW MV Germany power Grid meet Grid standards VDE 0126 Italy power Grid meet Grid standards CEI 0 16 UK power Grid Greece Island power Grid Czech Republic power Grid meet Grid...

Page 6: ...ed person There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT Quality Certificate...

Page 7: ...s section of ac cables Description A B C D No Figure 3 5 Strip off N L1 L2 L3 cables 2 Strip off PE cable as gure 3 6 1 Add breaker or fuse to AC side the speci cation should be more than 1 25 times o...

Page 8: ...the terminal accord ing to the wire sequence L1 L2 L3 N PE so that the insulating terminal is ush with the surface of the terminal and the crimping screw torque is 2 0 0 1N m 6 Insert the main part of...

Page 9: ...cable connected to the two string correctly and it s polarity 3 The unused terminals are covered Starting the inverter Close the DC and AC circuit breaker If the solar panels provide enough energy the...

Page 10: ...t 1 2 3 4 Press pushbutton less than 1 sec several times until you reach the Setting menu Press pushbutton long in order to enter the setting menu Press pushbutton less than 1 sec several times until...

Page 11: ...nverter is 60 months from the date of installation and no more than 66 months 5 5 years from the date of shipment from factory Please report defective device with a brief error description and SN code...

Page 12: ...o factory or and repaired products are sent from factory to user 5 2 Service after warranty expiration 1 2 3 4 Possible actions Isolation Fault Isolation Fault 2 LCD display Clearable Fault Fault 1 Ch...

Page 13: ...AC P OW E R T E C H N O L O GY C O LT D Add Block 6 No 2 West Jinzhi Road Suzhou National Hi Tech District Suzhou China Tel 86 0512 66677278 info renacpower com www renacpower com SMARTENERGYFORBETTE...