Consistent Faults:

Consist VGrid

Consist Freq
Consist GFCI

Consist DCI

RelayFail

BusUnbalance

IacUnbalance

EEPROM_W Fail

EEPROM_R Fail

IpvUnbalance

GFCIFault

AuxPowerFault

DCI out range

OCPV

OCPV2

OCIGrid

SciCommLose

SpiCommLose

BusFault

CPU ADFault

IGridDevice

PLLFault

AutoTestFail

PVConfigFault

FanError

LCD display

Permanent Fault

Fault

1.  Disconnect all PV (+) or PV (-) from solar panels

2.  Wait for a few seconds.

3.  After the LCD switches off, reconnect and check again.

4.  If the problem remains, please call local service.

 422-00023-07

For products which are out of warranty, factory charges an on-site service fee, parts, labor cost and logistic fee to end-user 
which can be any/all of:

     On-site attendance fee: Cost of travel and time for the technician in attending on-site;
     Parts: Cost of replacement parts (including any shipping/admin fee that may apply);

     

Labor: Labor time fee charged for the technician, who is repairing, maintaining, and installing (hardware or software) and 

     debugging the faulty product;

     

Logistic fee: Cost of delivery, tariff and other derived expense when defective products are sent from user to factory or / 

     and repaired products are sent from factory to user;

5.2  Service after warranty expiration

1)
2)
3)

4)

Possible actions

Isolation Fault

Isolation Fault 2

LCD display

Clearable Fault

Fault

1.  Check whether the inverter is earthed and test impedance between PV (+) 

& (-) and the impedance must exceed 3MΩ;

2.  Check whether the AC-side has contacts with earth.

Grid Faults:

Fault OVR
Fault UVR

Fault OFR
Fault UFR

1.  Wait for 5 minutes, if the grid returns to normal, PV inverter automatically 

restarts.

2.  Make sure grid voltage and frequency meet the local specifications.

No Utility

1.  Grid is not connected.

2.  Check grid connection cables.

3.  Check grid usability.

4.  If grid is ok and the problem exists still, maybe the fuse in the inverter is 

open, please call service.

OverTemp

1.  The internal temperature of inverter is higher than specified normal value.

2.  Find a way to reduce the ambient temperature.Or move the inverter to a

 cooler environment.

PVOVFault

PV2OVFault

1.  Check the open PV DC voltage, and see if it is greater than or too close to 

950VDC

2.  If PV DC voltage is less than 950VDC, and the problem still occurs, please 

call local service.

Appendix A: FAQ (Frequently asked questions)

Sometimes, the PV system does not work normally; we recommend the following solutions for average troubleshooting. 
This can help the technician to understand the problem and take a proper action.

Summary of Contents for R3 Micro Series

Page 1: ...R3 4K DT R3 5K DT R3 6K DT R3 8K DT R3 10K DT R3 12K DT R3 15K DT UserManual Series R3 Note...

Page 2: ...ackageinformation 8 3 2Installationenvironment 8 3 3Installationposition 9 3 4Mountingprocedure 10 3 5Electricalconnection 11 3 6StartingtheInverter 15 4 UserInterface 15 4 1Ledandkey 15 4 2LCDdisplay...

Page 3: ...red that the open circuit voltage of the PV string never exceeds the maximum permissible input voltage of 1000V DC The PV string open circuit voltage during parallel string operation is 950V Higher vo...

Page 4: ...mainly on internal and ambient temperatures The limitation is calculated continuously and always allows the maximum possible amount of energy to be produced Please use the tool supplied by Renac Power...

Page 5: ...id meet Grid standards BDEW MV Germany power Grid meet Grid standards VDE 0126 Italy power Grid meet Grid standards CEI 0 16 UK power Grid Greece Island power Grid Czech Republic power Grid meet Grid...

Page 6: ...ed person There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT Quality Certificate...

Page 7: ...s section of ac cables Description A B C D No Figure 3 5 Strip off N L1 L2 L3 cables 2 Strip off PE cable as gure 3 6 1 Add breaker or fuse to AC side the speci cation should be more than 1 25 times o...

Page 8: ...the terminal accord ing to the wire sequence L1 L2 L3 N PE so that the insulating terminal is ush with the surface of the terminal and the crimping screw torque is 2 0 0 1N m 6 Insert the main part of...

Page 9: ...cable connected to the two string correctly and it s polarity 3 The unused terminals are covered Starting the inverter Close the DC and AC circuit breaker If the solar panels provide enough energy the...

Page 10: ...t 1 2 3 4 Press pushbutton less than 1 sec several times until you reach the Setting menu Press pushbutton long in order to enter the setting menu Press pushbutton less than 1 sec several times until...

Page 11: ...nverter is 60 months from the date of installation and no more than 66 months 5 5 years from the date of shipment from factory Please report defective device with a brief error description and SN code...

Page 12: ...o factory or and repaired products are sent from factory to user 5 2 Service after warranty expiration 1 2 3 4 Possible actions Isolation Fault Isolation Fault 2 LCD display Clearable Fault Fault 1 Ch...

Page 13: ...AC P OW E R T E C H N O L O GY C O LT D Add Block 6 No 2 West Jinzhi Road Suzhou National Hi Tech District Suzhou China Tel 86 0512 66677278 info renacpower com www renacpower com SMARTENERGYFORBETTE...

Reviews: