4.4  Setting language

4.5  Setting modbus address

4.6  Self-Test in accordance with CEI 0-21 (Applies to Italy only)

The self-test is only required for inverters, which are commissioned in Italy. The Italian standard requires that all inverters 
feeding into the utility grid are equipped with a self-test function in accordance with CEI 0-21. During the self-test, the 
inverter will consecutively check the protection reaction times and values for overvoltage, under voltage, over frequency 
and under frequency. 

Self-test function is available at any time. It also allows end user get test reports shown on LCD display.

There are two ways to execute the self-test:

Auto-Test from screen:

     Press pushbutton less than 1 sec. several times until you reach the “Setting” menu.
     Press pushbutton long in order to enter the “setting” menu.

     

Press pushbutton less than 1 sec. several times until you reach the “AutoTest-Italy” menu (You need to set the inverter 

     

country to CEI 0-21 before testing).

Press pushbutton less than 1 sec. several times until you reach the “Setting” menu.
Press pushbutton long in order to enter the “setting” menu.
Press pushbutton less than 1 sec. several times until you reach the “language setting” menu.
Press pushbutton less than 1 sec. to the langue menu you want and Press pushbutton long to select.

1)
2)
3)
4)

Press pushbutton less than 1 sec. several times until you reach the “Setting” menu.
Press pushbutton long in order to enter the “setting” menu.
Press pushbutton less than 1 sec. several times until you reach the “module add” menu.
Press pushbutton less than 1 sec. to the modbus address number you want and Press pushbutton long to set.

1)
2)
3)
4)

1)
2)
3)

4.2  LCD display

Menu structure:

4.3  Factory setting

Press pushbutton long in order to enter the “Factory setting” menu.
Press pushbutton long to enter the “language setting” menu.
Press pushbutton less than 1 sec. to the langue menu you want and Press pushbutton long to select.
Press pushbutton less than 1 sec. to the country menu you want and Press pushbutton long to select.

           Press the button less than 1 second   

           long Press the button

           Return

1)
2)
3)
4)

SafetyCountry

CEI                       0-21

Auto Test-Italy

Pac=          10000

w

Normal/fault

Power

      W

Vpv1

         V

Power

        W

 Ipv2

         A

Power

       W

Vac A

      V

Power

      W

Iac A

       A

Power

      W

Fac

         Hz

Power

     W

E-today

 KwH

Power

        W

E-total

 KwH

Power

       W

SN NO.

Moudle

Firmware

M: ×.××    S:×.××

Country

××××××

Event list

Power

          W

Setting

Power

          W

Fault code1   

Power

         W

Language setting   

Power

          W

Country setting   

Power

          W

...   

Power

          W

 ... 

Power

          W

U

se

r s

et

tin

g

Fa

ct

or

se

tti

ng

Language   

Factory setting

Country setting   

Factory setting

Module Add

xx

PF setting 

Power

          W

Clear events   

Power

          W

Factory setting 

Power

      W

Clear E-total

Power

        W

PF

  xxx 

Power

           W

Setting Add 

Pac  =          W

中文

   

Factory setting

English   

Factory setting

VDE4105   

Factory setting

中国

2  

Factory setting

...   

Factory setting

Fault code ...   

Power

         W

...   

Power

          W

...

Power

      W

Factory setting 

Power

      W

xx 

Pac  =          W

Auto test 

Pac  =          W

...

Power

      W

Summary of Contents for R3 Micro Series

Page 1: ...R3 4K DT R3 5K DT R3 6K DT R3 8K DT R3 10K DT R3 12K DT R3 15K DT UserManual Series R3 Note...

Page 2: ...ackageinformation 8 3 2Installationenvironment 8 3 3Installationposition 9 3 4Mountingprocedure 10 3 5Electricalconnection 11 3 6StartingtheInverter 15 4 UserInterface 15 4 1Ledandkey 15 4 2LCDdisplay...

Page 3: ...red that the open circuit voltage of the PV string never exceeds the maximum permissible input voltage of 1000V DC The PV string open circuit voltage during parallel string operation is 950V Higher vo...

Page 4: ...mainly on internal and ambient temperatures The limitation is calculated continuously and always allows the maximum possible amount of energy to be produced Please use the tool supplied by Renac Power...

Page 5: ...id meet Grid standards BDEW MV Germany power Grid meet Grid standards VDE 0126 Italy power Grid meet Grid standards CEI 0 16 UK power Grid Greece Island power Grid Czech Republic power Grid meet Grid...

Page 6: ...ed person There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT Quality Certificate...

Page 7: ...s section of ac cables Description A B C D No Figure 3 5 Strip off N L1 L2 L3 cables 2 Strip off PE cable as gure 3 6 1 Add breaker or fuse to AC side the speci cation should be more than 1 25 times o...

Page 8: ...the terminal accord ing to the wire sequence L1 L2 L3 N PE so that the insulating terminal is ush with the surface of the terminal and the crimping screw torque is 2 0 0 1N m 6 Insert the main part of...

Page 9: ...cable connected to the two string correctly and it s polarity 3 The unused terminals are covered Starting the inverter Close the DC and AC circuit breaker If the solar panels provide enough energy the...

Page 10: ...t 1 2 3 4 Press pushbutton less than 1 sec several times until you reach the Setting menu Press pushbutton long in order to enter the setting menu Press pushbutton less than 1 sec several times until...

Page 11: ...nverter is 60 months from the date of installation and no more than 66 months 5 5 years from the date of shipment from factory Please report defective device with a brief error description and SN code...

Page 12: ...o factory or and repaired products are sent from factory to user 5 2 Service after warranty expiration 1 2 3 4 Possible actions Isolation Fault Isolation Fault 2 LCD display Clearable Fault Fault 1 Ch...

Page 13: ...AC P OW E R T E C H N O L O GY C O LT D Add Block 6 No 2 West Jinzhi Road Suzhou National Hi Tech District Suzhou China Tel 86 0512 66677278 info renacpower com www renacpower com SMARTENERGYFORBETTE...

Reviews: