Renac R3 Micro Series User Manual Download Page 1

R3-4K-DT
R3-5K-DT
R3-6K-DT
R3-8K-DT
R3-10K-DT
R3-12K-DT
R3-15K-DT

User Manual

Series

R3 Note

Summary of Contents for R3 Micro Series

Page 1: ...R3 4K DT R3 5K DT R3 6K DT R3 8K DT R3 10K DT R3 12K DT R3 15K DT UserManual Series R3 Note...

Page 2: ...ackageinformation 8 3 2Installationenvironment 8 3 3Installationposition 9 3 4Mountingprocedure 10 3 5Electricalconnection 11 3 6StartingtheInverter 15 4 UserInterface 15 4 1Ledandkey 15 4 2LCDdisplay...

Page 3: ...red that the open circuit voltage of the PV string never exceeds the maximum permissible input voltage of 1000V DC The PV string open circuit voltage during parallel string operation is 950V Higher vo...

Page 4: ...mainly on internal and ambient temperatures The limitation is calculated continuously and always allows the maximum possible amount of energy to be produced Please use the tool supplied by Renac Power...

Page 5: ...id meet Grid standards BDEW MV Germany power Grid meet Grid standards VDE 0126 Italy power Grid meet Grid standards CEI 0 16 UK power Grid Greece Island power Grid Czech Republic power Grid meet Grid...

Page 6: ...ed person There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT Quality Certificate...

Page 7: ...s section of ac cables Description A B C D No Figure 3 5 Strip off N L1 L2 L3 cables 2 Strip off PE cable as gure 3 6 1 Add breaker or fuse to AC side the speci cation should be more than 1 25 times o...

Page 8: ...the terminal accord ing to the wire sequence L1 L2 L3 N PE so that the insulating terminal is ush with the surface of the terminal and the crimping screw torque is 2 0 0 1N m 6 Insert the main part of...

Page 9: ...cable connected to the two string correctly and it s polarity 3 The unused terminals are covered Starting the inverter Close the DC and AC circuit breaker If the solar panels provide enough energy the...

Page 10: ...t 1 2 3 4 Press pushbutton less than 1 sec several times until you reach the Setting menu Press pushbutton long in order to enter the setting menu Press pushbutton less than 1 sec several times until...

Page 11: ...nverter is 60 months from the date of installation and no more than 66 months 5 5 years from the date of shipment from factory Please report defective device with a brief error description and SN code...

Page 12: ...o factory or and repaired products are sent from factory to user 5 2 Service after warranty expiration 1 2 3 4 Possible actions Isolation Fault Isolation Fault 2 LCD display Clearable Fault Fault 1 Ch...

Page 13: ...AC P OW E R T E C H N O L O GY C O LT D Add Block 6 No 2 West Jinzhi Road Suzhou National Hi Tech District Suzhou China Tel 86 0512 66677278 info renacpower com www renacpower com SMARTENERGYFORBETTE...