Commissioning
Initial commissioning
The air filters are shrink-wrapped in film when
delivered. The filters must be removed from the
unit and unpacked before initial commissioning.
The procedure for removing and inserting the fil-
ters is described in the “Care and maintenance”
chapter.
Important notes prior to commissioning
n
All extensions to the electrical connection must
be of a sufficient cable size and must only be
used fully rolled out or unrolled.
n
Never use the power supply connection cable
as a pull cord.
NOTICE!
Operating the unit with welded-in filters can
cause damage to the internal components of
the unit.
Commissioning
Start the unit as follows:
1.
Plug the unit's power plug into a properly
installed and fused mains socket (230V/50
Hz).
If you connect the air purifier to the mains,
the unit should be switched off (not oper-
ating). The operating unit emits an acoustic
signal.
2.
Actuate the “ON/OFF” key. The operating
unit emits an acoustic signal. The “ON/OFF”
button lights up to indicate that the unit is
activated.
3.
Select the desired operating parameters on
the operating panel.
Automatic restart after power failure:
If the electrical power fails or if the power plug is
pulled out during operation, the unit switches off.
When the power source is restored or when the
plug is plugged in again, the unit restarts automati-
cally with the saved settings.
7
Shutdown
If the air purifier is to be deactivated, this can be
done either manually using the “ON/OFF” key on
the operating panel or automatically using the pre-
set switch-off delay (“Timer” key).
NOTICE!
If a shutdown with a longer service life is
planned, it is recommended to dispose of the fil-
ters for reasons of hygiene and to replace them
when they are put back into operation.