Installation instructions for qualified personnel
Important notes prior to
installation
■
Transport the unit in its original
packaging as close as possible
to the installation location.
This helps to prevent damage
during transportation.
■
Check the contents of the
packaging for completeness
and check the unit for visible
transport damage. Report any
damage immediately to your
contractual partner and the
shipping company.
■
Lift the unit on the corners and
not on the refrigerant
or condensate connections.
■
The refrigerant pipes
(injection and suction line),
valves and connections must be
insulated impervious to vapour
diffusion. If necessary, also
insulate the condensate line.
■
Select an installation location
which allows air to flow
freely through the intake and
outlet (see section "Minimum
clearances").
■
Do not install the unit in the
immediate vicinity of devices
which generate intensive
thermal radiation. Installation
near sources of thermal
radiation reduces the output of
the unit.
■
Only open the shut-off valves
of the refrigerant pipes after
installation is complete.
■
Seal off open refrigerant lines
with suitable caps or adhesive
strips to prevent the infiltration
of moisture and never kink or
compress the refrigerant pipes.
■
Avoid unnecessary bends.
You thereby minimise loss of
pressure in the refrigerant pipes
and ensure clear return flow of
the compressor oil.
■
Take special precautions with
regard to the oil return if
the outdoor component is
located above the indoor unit.
See section "Oil return flow
measures".
■
Only use the refrigerant pipes
provided in the delivery and
only removethe protective caps
shortly before connection to the
outdoor component.
■
Make all electrical connections
in accordance with applicable
DIN and VDE standards.
■
Always attach electrical lines
properly in electrical clamps,
otherwise a fire could result.
Both units and the extension
lines are pre-filled with
refrigerant.
Suitable protective clothing
must be worn during
installation.
!
ATTENTION
REMKO BL
16