Introduction
Preventive maintenance (PM) is essential for the proper operation of the Line.
Elements of an effective PM program include documentation, verification of proper
operation, routine maintenance, inspection, spare/replacement parts, and electrical
maintenance.
CAUTION!
Do not attempt to perform any maintenance on equipment until all safety instruction
have been reviewed and all power sources are locked out as described in Chapter 3 -
Safety.
Routine Maintenance
Lubrication of Bearings
All of the mounted bearings require grease lubrication.
Gear Box Oil
See manufactures recommendations regarding changing oil in the drive motor
gearbox.
UHMW Wear Strips, on conveyors
The wear strips on each conveyor section should be inspected after every year of
operation. Replace the wear strip if it shows signs of excessive wear.
Summary of Contents for iREL Systems
Page 1: ......
Page 22: ...www relinc com iREL Systems 21 Ramp Conveyor Figure 17 Ramp Conveyor Figure 18 Ramp Conveyor ...
Page 24: ...www relinc com iREL Systems 23 Figure 20 Paint Conveyor Figure 21 Paint Conveyor ...
Page 28: ...www relinc com iREL Systems 27 Figure 26 High Speed Tipple Figure 27 High Speed Tipple ...
Page 34: ...www relinc com iREL Systems 33 Figure 36 Board Flipper 1 Figure 37 Board Flipper 1 ...
Page 40: ...www relinc com iREL Systems 39 Figure 46 Board Accumulator Figure 47 Board Accumulator ...
Page 41: ...www relinc com iREL Systems 40 Figure 49 Board Accumulator Figure 48 Board Accumulator ...
Page 45: ...www relinc com iREL Systems 44 Flipper Accumulator Figure 53 Flipper Accumulators ...
Page 48: ......